ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
IA0551 #06 Y:2015 | 06 | 2015 | Install occupancy sensors | $527 | $2,380 | |
IA0551 #05 Y:2015 | 05 | 2015 | Reduce the pressure of compressed air to the minimum required | $854 | $70 | |
IA0551 #04 Y:2015 | 04 | 2015 | Eliminate or reduce compressed air usage | $989 | $330 | |
IA0551 #03 Y:2015 | 03 | 2015 | Utilize higher efficiency lamps and/or ballasts | $1,021 | $2,627 | |
IA0551 #02 Y:2015 | 02 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,938 | $578 | |
IA0551 #01 Y:2015 | 01 | 2015 | Utilize higher efficiency lamps and/or ballasts | $12,782 | $23,025 | |
SU0396 #12 Y:2015 | 12 | 2015 | Add area lighting switches | $781 | $3,851 | |
SU0396 #11 Y:2015 | 11 | 2015 | Conserve energy by efficient use of vending machines | $112 | $462 | |
SU0396 #10 Y:2015 | 10 | 2015 | Install compressor air intakes in coolest locations | $419 | - | |
SU0396 #09 Y:2015 | 09 | 2015 | Eliminate/reduce an operation | $1,222 | $2,440 | |
SU0396 #08 Y:2015 | 08 | 2015 | Replace existing hvac unit with high efficiency model | $18,009 | $17,408 | |
SU0396 #07 Y:2015 | 07 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,544 | $1,250 | |
SU0396 #06 Y:2015 | 06 | 2015 | Replace electrically-operated equipment with fossil fuel equipment | $17,027 | $20,360 | |
SU0396 #05 Y:2015 | 05 | 2015 | Utilize higher efficiency lamps and/or ballasts | $1,889 | $930 | |
SU0396 #04 Y:2015 | 04 | 2015 | Check for accuracy of utility / power meters | $243 | - | |
SU0396 #03 Y:2015 | 03 | 2015 | Reduce the pressure of compressed air to the minimum required | $486 | - | |
SU0396 #02 Y:2015 | 02 | 2015 | Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $738 | - | |
SU0396 #01 Y:2015 | 01 | 2015 | Pay bills on time to avoid late fees | $813 | - | |
UD0471 #06 Y:1995 | 06 | 1995 | Utilize a central coolant system for cleaning and reuse of metal working fluid | $54,000 | $7,500 | |
UD0471 #05 Y:1995 | 05 | 1995 | Meter recycled water (to reduce sewer charges) | $1,313 | $200 |