ITAC Assessment: UD0471
ITAC logo
ITAC Assessment: UD0471
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product power steering pumps, marine tilt motors
NAICS
n/a
SIC 3914: Silverware, Plated Ware, and Stainless Steel Ware
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 208,000
ft2
Annual Production 1,300,000
pieces
Production Hrs. Annual 8,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $487,378 9,672,040
kWh
Natural Gas $71,970 15,584
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $145,691 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $145,691

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Other Liquid (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings
01 2.3511: Use plant owned transformers or lease transformers $46,950 $180,000 $51,030
-
kWh
- - $(-4,080.0) -
02 2.8113: Purchase gas directly from a contract gas supplier $26,000 $50,000 - - - $26,000 -
03 2.4226: Use / purchase optimum sized compressor $4,642 $600 $4,080
192,556
kWh
- - - $562
04 2.7142: Utilize higher efficiency lamps and/or ballasts $12,786 $3,320 $11,666
275,791
kWh
- - $1,120 -
05 3.4116: Meter recycled water (to reduce sewer charges) $1,313 $200 - $1,313
-
Tgal
- - -
06 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid $54,000 $7,500 - - $54,000
-
gal
- -
TOTAL RECOMMENDED $145,691 $241,620 $66,776
468,347
kWh
$1,313
-
Tgal
$54,000
-
gal
$23,040 $562
TOTAL IMPLEMENTED $145,691 $241,620 $66,776
468,347
kWh
$1,313
-
Tgal
$54,000
-
gal
$23,040 $562
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Disposal Savings Other Liquid (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs