| Assessment Year | 2016 |
|---|---|
| Principal Product | Cutlery |
| NAICS | 332215: Metal Kitchen Cookware, Utensil, Cutlery, and Flatware (except Precious) Manufacturing |
| SIC | 3914: Silverware, Plated Ware, and Stainless Steel Ware |
| Sales Range | $10 M to 50M |
| # of Employees | 107 |
| Plant Area |
48,000
ft2
|
| Annual Production | 4,000,000
pieces
|
| Production Hrs. Annual | 4,335
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $61,218 | 963,072 |
kWh
|
$0.064 |
| Electricity Demand | $40,410 | 3,936 |
kW-mo/yr
|
$10.27 |
| Natural Gas | $33,323 | 6,080 |
MMBtu
|
$5.48 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $18,111 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $17,584 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,782 | $23,025 |
$8,394
131,544
kWh
|
$4,388
-
kW-mo/yr
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,938 | $578 |
$1,305
20,358
kWh
|
$633
-
kW-mo/yr
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,021 | $2,627 |
$1,021
16,004
kWh
|
- | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $989 | $330 |
$663
10,387
kWh
|
$326
-
kW-mo/yr
|
|
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $854 | $70 |
$572
8,970
kWh
|
$282
-
kW-mo/yr
|
|
| 06 | 2.7135: Install occupancy sensors | $527 | $2,380 |
$527
8,271
kWh
|
- | |
| TOTAL RECOMMENDED | $18,111 | $29,010 |
$12,482
195,534
kWh
|
$5,629
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $17,584 | $26,630 |
$11,955
187,263
kWh
|
$5,629
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs