ITAC Assessment: MO0221
ITAC logo
ITAC Assessment: MO0221
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Heat Vent Air Equipment and Fixtures
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 133,990
ft2
Annual Production 175
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,948 840,270
kWh
Electricity Demand $17,408 373
kW-mo/yr
Electricity Fees $3,588 -
Natural Gas $53,575 8,451
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,970 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,151

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.711: Initiate a total quality management program $23,659 $30,000 - - - $23,659
02 4.432: Cross-train personnel to avoid lost time $14,206 $25,000 - - - $14,206
03 4.611: Begin a practice of predictive / preventative maintenance $10,720 $3,700 - - - $10,720
04 4.514: Re-arrange equipment layout to reduce handling costs $6,499 $12,500 - - - $6,499
05 2.7142: Utilize higher efficiency lamps and/or ballasts $744 $1,472 $562
12,016
kWh
$182
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $280 $491 $210
4,396
kWh
$70
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $280 $552 $252
5,275
kWh
$28
-
kW-mo/yr
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $641 $80 $552
11,723
kWh
$89
-
kW-mo/yr
- -
09 2.4221: Install compressor air intakes in coolest locations $390 $100 $259
5,569
kWh
$131
-
kW-mo/yr
- -
10 2.4133: Use most efficient type of electric motors $1,452 $2,554 $1,162
24,619
kWh
$290
-
kW-mo/yr
- -
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $79 - $65
1,465
kWh
$14
-
kW-mo/yr
- -
12 3.1191: Change procedures / equipment / operating conditions $8,305 $20,000 - - $8,305
-
lb
-
13 2.7496: Install partitions to reduce size of conditioned space $6,715 $17,500 - - $6,715
-
lb
-
TOTAL RECOMMENDED $73,970 $113,949 $3,062
65,063
kWh
$804
-
kW-mo/yr
$15,020
-
lb
$55,084
TOTAL IMPLEMENTED $17,151 $29,617 $2,258
48,065
kWh
$687
-
kW-mo/yr
- $14,206
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs