ITAC Assessment: SU0396
ITAC logo
ITAC Assessment: SU0396
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Flatware
NAICS 339910: Jewelry and Silverware Manufacturing
SIC 3914: Silverware, Plated Ware, and Stainless Steel Ware
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 240,000
ft2
Annual Production 250,000
lb
Production Hrs. Annual 2,184
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,510 3,159,730
kWh
Electricity Demand $47,222 10,892
kW-mo/yr
Natural Gas $29,738 5,003
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,283 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,138

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 4.821: Pay bills on time to avoid late fees $813 - - - - - $813
02 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $738 - $738
18,590
kWh
- - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $486 - $315
7,925
kWh
$171
-
kW-mo/yr
- - -
04 2.8118: Check for accuracy of utility / power meters $243 - - - - - $243
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,889 $930 $181
4,555
kWh
$27
-
kW-mo/yr
- $1,050 $631
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $17,027 $20,360 $14,673
369,600
kWh
$4,330
-
kW-mo/yr
$(-1,976.0)
-
MMBtu
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,544 $1,250 $1,009
25,428
kWh
$535
-
kW-mo/yr
- - -
08 2.7232: Replace existing hvac unit with high efficiency model $18,009 $17,408 - - $18,009
-
MMBtu
- -
09 3.1161: Eliminate/reduce an operation $1,222 $2,440 $(-6.0)
(-149)
kWh
$(-145.0)
-
kW-mo/yr
- $450 $923
10 2.4221: Install compressor air intakes in coolest locations $419 - $274
6,906
kWh
$145
-
kW-mo/yr
- - -
11 2.6211: Conserve energy by efficient use of vending machines $112 $462 $112
2,828
kWh
- - - -
12 2.7131: Add area lighting switches $781 $3,851 $355
8,954
kWh
$426
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $43,283 $46,701 $17,651
444,637
kWh
$5,489
-
kW-mo/yr
$16,033
-
MMBtu
$1,500 $2,610
TOTAL IMPLEMENTED $39,138 $38,698 $15,866
399,651
kWh
$4,502
-
kW-mo/yr
$16,033
-
MMBtu
$1,050 $1,687
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs