Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Jewelry, precious metal
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0456 #11 Y:2015 Install occupancy sensors $374 $750
BD0456 #10 Y:2015 Utilize higher efficiency lamps and/or ballasts $606 $400
BD0456 #09 Y:2015 Utilize higher efficiency lamps and/or ballasts $1,006 $548
BD0456 #08 Y:2015 Reduce illumination to minimum necessary levels $678 $210
BD0456 #07 Y:2015 Install compressor air intakes in coolest locations $685 $1,500
BD0456 #06 Y:2015 Use most efficient type of electric motors $843 $920
BD0456 #05 Y:2015 Use power during off-peak periods $1,111 $17
BD0456 #04 Y:2015 Utilize higher efficiency lamps and/or ballasts $1,225 $1,219
BD0456 #03 Y:2015 Use power during off-peak periods $5,111 $17
BD0456 #02 Y:2015 Eliminate or reduce compressed air usage $22,269 $19,500
BD0456 #01 Y:2015 Install vinyl strip / high speed / air curtain doors $6,758 $5,000
CO0618 #06 Y:2008 Reduce illumination to minimum necessary levels $1,050 $640
CO0618 #05 Y:2008 Install occupancy sensors $1,780 $50,000
CO0618 #04 Y:2008 Improve air circulation with destratification fans / other methods $1,950 $42,300
CO0618 #03 Y:2008 Use solar heat to make electricty $5,170 $61,600
CO0618 #02 Y:2008 Minimize operation of equipment maintained in standby condition $19,720 $10,000
CO0618 #01 Y:2008 Use power during off-peak periods $15,050 -
UU0031 #05 Y:2002 Utilize higher efficiency lamps and/or ballasts $58 $366
UU0031 #04 Y:2002 Add equipment/ operators to reduce production bottleneck $121,213 $2,000,000
UU0031 #03 Y:2002 Reduce the pressure of compressed air to the minimum required $1,692 $20