Assessment Year | 2015 |
---|---|
Principal Product | Custom jewelry and awards |
NAICS | 339910: Jewelry and Silverware Manufacturing |
SIC | 3911: Jewelry, Precious Metal |
Sales Range | $10 M to 50M |
# of Employees | 146 |
Plant Area |
54,000
ft2
|
Annual Production | 318,483
pieces
|
Production Hrs. Annual | 2,496
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $78,525 | 1,035,132 |
kWh
|
$0.076 |
Electricity Demand | $35,735 | 3,857 |
kW-mo/yr
|
$9.26 |
Electricity Fees | $1,944 | - |
|
- |
Natural Gas | $26,824 | 4,032 |
MMBtu
|
$6.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,666 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,297 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $6,758 | $5,000 | - | - |
$6,758
-
MMBtu
|
- | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $22,269 | $19,500 |
$15,134
199,405
kWh
|
$7,135
-
kW-mo/yr
|
- | - | - | |
03 | 2.3137: Use power during off-peak periods | $5,111 | $17 | - |
$5,111
-
kW-mo/yr
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,225 | $1,219 |
$770
10,146
kWh
|
$451
-
kW-mo/yr
|
- | $1 | $3 | |
05 | 2.3137: Use power during off-peak periods | $1,111 | $17 | - |
$1,111
-
kW-mo/yr
|
- | - | - | |
06 | 2.4133: Use most efficient type of electric motors | $843 | $920 |
$687
9,058
kWh
|
$156
-
kW-mo/yr
|
- | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $685 | $1,500 |
$432
5,688
kWh
|
$253
-
kW-mo/yr
|
- | - | - | |
08 | 2.7111: Reduce illumination to minimum necessary levels | $678 | $210 |
$300
3,955
kWh
|
$312
-
kW-mo/yr
|
- | $18 | $48 | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,006 | $548 |
$759
10,005
kWh
|
$227
-
kW-mo/yr
|
- | $6 | $14 | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $606 | $400 |
$354
4,660
kWh
|
$59
-
kW-mo/yr
|
- | $81 | $112 | |
11 | 2.7135: Install occupancy sensors | $374 | $750 |
$302
3,985
kWh
|
$72
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $40,666 | $30,081 |
$18,738
246,902
kWh
|
$14,887
-
kW-mo/yr
|
$6,758
-
MMBtu
|
$106 | $177 | ||
TOTAL IMPLEMENTED | $2,297 | $2,448 |
$1,545
20,353
kWh
|
$539
-
kW-mo/yr
|
- | $87 | $126 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs