ITAC Assessment: BD0456
ITAC logo
ITAC Assessment: BD0456
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Custom jewelry and awards
NAICS 339910: Jewelry and Silverware Manufacturing
SIC 3911: Jewelry, Precious Metal
Sales Range $10
M
to 50
M
# of Employees 146
Plant Area 54,000
ft2
Annual Production 318,483
pieces
Production Hrs. Annual 2,496
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,525 1,035,132
kWh
Electricity Demand $35,735 3,857
kW-mo/yr
Electricity Fees $1,944 -
Natural Gas $26,824 4,032
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,666 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,297

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $6,758 $5,000 - - $6,758
-
MMBtu
- -
02 2.4239: Eliminate or reduce compressed air usage $22,269 $19,500 $15,134
199,405
kWh
$7,135
-
kW-mo/yr
- - -
03 2.3137: Use power during off-peak periods $5,111 $17 - $5,111
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,225 $1,219 $770
10,146
kWh
$451
-
kW-mo/yr
- $1 $3
05 2.3137: Use power during off-peak periods $1,111 $17 - $1,111
-
kW-mo/yr
- - -
06 2.4133: Use most efficient type of electric motors $843 $920 $687
9,058
kWh
$156
-
kW-mo/yr
- - -
07 2.4221: Install compressor air intakes in coolest locations $685 $1,500 $432
5,688
kWh
$253
-
kW-mo/yr
- - -
08 2.7111: Reduce illumination to minimum necessary levels $678 $210 $300
3,955
kWh
$312
-
kW-mo/yr
- $18 $48
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,006 $548 $759
10,005
kWh
$227
-
kW-mo/yr
- $6 $14
10 2.7142: Utilize higher efficiency lamps and/or ballasts $606 $400 $354
4,660
kWh
$59
-
kW-mo/yr
- $81 $112
11 2.7135: Install occupancy sensors $374 $750 $302
3,985
kWh
$72
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $40,666 $30,081 $18,738
246,902
kWh
$14,887
-
kW-mo/yr
$6,758
-
MMBtu
$106 $177
TOTAL IMPLEMENTED $2,297 $2,448 $1,545
20,353
kWh
$539
-
kW-mo/yr
- $87 $126
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs