Assessment Year | 2002 |
---|---|
Principal Product | emblems precious metal |
NAICS |
n/a
|
SIC | 3911: Jewelry, Precious Metal |
Sales Range | $100 M to 500M |
# of Employees | 1,800 |
Plant Area |
n/a
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 4,954
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $197,979 | 7,468,800 |
kWh
|
$0.027 |
Electricity Demand | $128,162 | 39,804 |
kW-mo/yr
|
$3.22 |
Electricity Fees | $50,764 | - |
|
- |
Natural Gas | $89,505 | 95,347 |
MMBtu
|
$0.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $137,282 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $12,207 | $18,000 | - |
$12,207
-
kW-mo/yr
|
- | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,112 | - | - |
$2,112
-
kW-mo/yr
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,692 | $20 |
$701
23,523
kWh
|
$991
-
kW-mo/yr
|
- | |
04 | 4.111: Add equipment/ operators to reduce production bottleneck | $121,213 | $2,000,000 |
$54,740
1,817,116
kWh
|
$44,000
-
kW-mo/yr
|
$22,473
-
MMBtu
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $58 | $366 |
$34
1,043
kWh
|
$24
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $137,282 | $2,018,386 |
$55,475
1,841,682
kWh
|
$59,334
-
kW-mo/yr
|
$22,473
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs