ITAC Assessment: UU0031
ITAC logo
ITAC Assessment: UU0031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product emblems precious metal
NAICS
n/a
SIC 3911: Jewelry, Precious Metal
Sales Range $100
M
to 500
M
# of Employees 1,800
Plant Area
n/a
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,954
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $197,979 7,468,800
kWh
Electricity Demand $128,162 39,804
kW-mo/yr
Electricity Fees $50,764 -
Natural Gas $89,505 95,347
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $137,282 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $12,207 $18,000 - $12,207
-
kW-mo/yr
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,112 - - $2,112
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,692 $20 $701
23,523
kWh
$991
-
kW-mo/yr
-
04 4.111: Add equipment/ operators to reduce production bottleneck $121,213 $2,000,000 $54,740
1,817,116
kWh
$44,000
-
kW-mo/yr
$22,473
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $58 $366 $34
1,043
kWh
$24
-
kW-mo/yr
-
TOTAL RECOMMENDED $137,282 $2,018,386 $55,475
1,841,682
kWh
$59,334
-
kW-mo/yr
$22,473
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs