ITAC Assessment: CO0618
ITAC logo
ITAC Assessment: CO0618
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Jewelry and jewelry-making equipment
NAICS 339910: Jewelry and Silverware Manufacturing
SIC 3911: Jewelry, Precious Metal
Sales Range $100
M
to 500
M
# of Employees 390
Plant Area 187,500
ft2
Annual Production 1,040,000
pieces
Production Hrs. Annual 3,120
hrs
Location (State) New Mexico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,755 2,838,700
kWh
Electricity Demand $63,149 10,734
kW-mo/yr
Electricity Fees $78,803 -
Natural Gas $28,894 2,779
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,720 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,670

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3137: Use power during off-peak periods $15,050 - $15,050
266,600
kWh
- - - - -
02 2.6242: Minimize operation of equipment maintained in standby condition $19,720 $10,000 $19,720
478,700
kWh
- - - - -
03 2.9114: Use solar heat to make electricty $5,170 $61,600 $1,270
21,800
kWh
$1,070
-
kW-mo/yr
- - $2,830 -
04 2.7243: Improve air circulation with destratification fans / other methods $1,950 $42,300 $(-1,350.0)
(-28,900)
kWh
$(-520.0)
-
kW-mo/yr
$3,820
-
MMBtu
- - -
05 2.7135: Install occupancy sensors $1,780 $50,000 $790
13,500
kWh
$770
-
kW-mo/yr
- $10 - $210
06 2.7111: Reduce illumination to minimum necessary levels $1,050 $640 $410
7,000
kWh
$530
-
kW-mo/yr
- - - $110
TOTAL RECOMMENDED $44,720 $164,540 $35,890
758,700
kWh
$1,850
-
kW-mo/yr
$3,820
-
MMBtu
$10 $2,830 $320
TOTAL IMPLEMENTED $29,670 $164,540 $20,840
492,100
kWh
$1,850
-
kW-mo/yr
$3,820
-
MMBtu
$10 $2,830 $320
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs