Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Watches, clocks, clockwork operated devices, and parts
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WI0503 #07 Y:2005 Reschedule plant operations or reduce load to avoid peaks $3,742 $4,900
WI0503 #06 Y:2005 Install compressor air intakes in coolest locations $1,350 $640
WI0503 #05 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $1,506 -
WI0503 #04 Y:2005 Recover waste heat from equipment $5,112 $1,000
WI0503 #03 Y:2005 Use optimum thickness insulation $8,005 $7,500
WI0503 #02 Y:2005 Utilize higher efficiency lamps and/or ballasts $11,209 $21,960
WI0503 #01 Y:2005 Improve space comfort conditioning $47,772 $9,625
GT0652 #07 Y:1998 Utilize higher efficiency lamps and/or ballasts $37,430 $130,994
GT0652 #06 Y:1998 Reduce the pressure of compressed air to the minimum required $3,300 -
GT0652 #05 Y:1998 Change procedures / equipment / operating conditions $10,000 $250
GT0652 #04 Y:1998 Utilize outside contracting $4,345 -
GT0652 #03 Y:1998 Install steam trap $2,103 $2,800
GT0652 #02 Y:1998 Meter waste water $6,890 $1,000
GT0652 #01 Y:1998 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $9,935 -
NC0081 #10 Y:1996 Use a less expensive method of waste removal $3,170 $25,000
NC0081 #09 Y:1996 Use in-process recycling whenever possible $9,000 $8,000
NC0081 #08 Y:1996 Reschedule plant operations or reduce load to avoid peaks $7,816 -
NC0081 #07 Y:1996 Air condition only space necessary $968 $1,500
NC0081 #06 Y:1996 Recycle air for heating, ventilation and air conditioning $9,258 $25,000
NC0081 #05 Y:1996 Use most efficient type of electric motors $5,626 $2,640