| Assessment Year | 2005 |
|---|---|
| Principal Product | Electronic Assemblies |
| NAICS | 334519: Other Measuring and Controlling Device Manufacturing |
| SIC | 3873: Watches, Clocks, Clockwork Operated Devices, and Parts |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
55,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $88,586 | 2,349,478 |
kWh
|
$0.038 |
| Electricity Demand | $49,589 | 5,204 |
kW-mo/yr
|
$9.53 |
| Natural Gas | $18,467 | 1,920 |
MMBtu
|
$9.62 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $78,696 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.424: Improve space comfort conditioning | $47,772 | $9,625 | - | - | - | $47,772 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,209 | $21,960 |
$7,138
179,340
kWh
|
$4,071
-
kW-mo/yr
|
- | - | |
| 03 | 2.2515: Use optimum thickness insulation | $8,005 | $7,500 | - | - |
$8,005
-
MMBtu
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $5,112 | $1,000 | - | - |
$5,112
-
MMBtu
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,506 | - |
$1,069
26,856
kWh
|
$437
-
kW-mo/yr
|
- | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $1,350 | $640 |
$838
21,059
kWh
|
$512
-
kW-mo/yr
|
- | - | |
| 07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,742 | $4,900 |
$2,088
52,453
kWh
|
$1,654
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $78,696 | $45,625 |
$11,133
279,708
kWh
|
$6,674
-
kW-mo/yr
|
$13,117
-
MMBtu
|
$47,772 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs