Assessment Year | 2005 |
---|---|
Principal Product | Electronic Assemblies |
NAICS | 334519: Other Measuring and Controlling Device Manufacturing |
SIC | 3873: Watches, Clocks, Clockwork Operated Devices, and Parts |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
55,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $88,586 | 2,349,478 |
kWh
|
$0.038 |
Electricity Demand | $49,589 | 5,204 |
kW-mo/yr
|
$9.53 |
Natural Gas | $18,467 | 1,920 |
MMBtu
|
$9.62 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $78,696 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.424: Improve space comfort conditioning | $47,772 | $9,625 | - | - | - | $47,772 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,209 | $21,960 |
$7,138
179,340
kWh
|
$4,071
-
kW-mo/yr
|
- | - | |
03 | 2.2515: Use optimum thickness insulation | $8,005 | $7,500 | - | - |
$8,005
-
MMBtu
|
- | |
04 | 2.2437: Recover waste heat from equipment | $5,112 | $1,000 | - | - |
$5,112
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,506 | - |
$1,069
26,856
kWh
|
$437
-
kW-mo/yr
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,350 | $640 |
$838
21,059
kWh
|
$512
-
kW-mo/yr
|
- | - | |
07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,742 | $4,900 |
$2,088
52,453
kWh
|
$1,654
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $78,696 | $45,625 |
$11,133
279,708
kWh
|
$6,674
-
kW-mo/yr
|
$13,117
-
MMBtu
|
$47,772 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs