ITAC Assessment: WI0503
ITAC logo
ITAC Assessment: WI0503
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Electronic Assemblies
NAICS 334519: Other Measuring and Controlling Device Manufacturing
SIC 3873: Watches, Clocks, Clockwork Operated Devices, and Parts
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 55,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,586 2,349,478
kWh
Electricity Demand $49,589 5,204
kW-mo/yr
Natural Gas $18,467 1,920
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,696 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 4.424: Improve space comfort conditioning $47,772 $9,625 - - - $47,772
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,209 $21,960 $7,138
179,340
kWh
$4,071
-
kW-mo/yr
- -
03 2.2515: Use optimum thickness insulation $8,005 $7,500 - - $8,005
-
MMBtu
-
04 2.2437: Recover waste heat from equipment $5,112 $1,000 - - $5,112
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,506 - $1,069
26,856
kWh
$437
-
kW-mo/yr
- -
06 2.4221: Install compressor air intakes in coolest locations $1,350 $640 $838
21,059
kWh
$512
-
kW-mo/yr
- -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,742 $4,900 $2,088
52,453
kWh
$1,654
-
kW-mo/yr
- -
TOTAL RECOMMENDED $78,696 $45,625 $11,133
279,708
kWh
$6,674
-
kW-mo/yr
$13,117
-
MMBtu
$47,772
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings