ITAC Assessment: KU0318
ITAC logo
ITAC Assessment: KU0318
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product STEEL CASTINGS
NAICS
n/a
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 165
Plant Area
n/a
Annual Production 6,200
ton
Production Hrs. Annual 4,000
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $783,072 13,985,053
kWh
Natural Gas $202,000 57,265
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $171,223 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $104,866

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $39,803 - - $39,803
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,872 $1,000 $2,265
40,445
kWh
- $607
03 2.7142: Utilize higher efficiency lamps and/or ballasts $713 $741 $509
9,086
kWh
- $204
04 2.7142: Utilize higher efficiency lamps and/or ballasts $74 $90 $74
1,172
kWh
- -
05 3.4115: Recover and reuse cooling water $65,074 $27,000 - - $65,074
06 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $61,404 - - $61,404
-
MMBtu
-
07 2.2422: Use waste heat from hot flue gases to generate steam $1,283 $3,200 - $1,283
-
MMBtu
-
TOTAL RECOMMENDED $171,223 $32,031 $2,848
50,703
kWh
$102,490
-
MMBtu
$65,885
TOTAL IMPLEMENTED $104,866 $1,831 $2,848
50,703
kWh
$101,207
-
MMBtu
$811
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs