ITAC Assessment: GT0652
ITAC logo
ITAC Assessment: GT0652
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Windup clocks
NAICS
n/a
SIC 3873: Watches, Clocks, Clockwork Operated Devices, and Parts
Sales Range $100
M
to 500
M
# of Employees 650
Plant Area 331,000
ft2
Annual Production 12,500,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $316,734 11,517,585
kWh
Electricity Demand $338,371 28,160
kW-mo/yr
Electricity Fees $55,383 -
Natural Gas $58,932 9,603
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,003 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Water Disposal Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $9,935 - n/a - $151,342
-
kW-mo/yr
- $(-73,656.0)
-
MMBtu
- - $(-15,345.0) $(-52,406.0)
02 3.4155: Meter waste water $6,890 $1,000 n/a - - - - - - - $6,890
03 2.2111: Install steam trap $2,103 $2,800 n/a - - $2,010
-
MMBtu
- $93
-
Tgal
- - -
04 4.422: Utilize outside contracting $4,345 - n/a $908
33,118
kWh
- $7,056
-
MMBtu
- - - $20,686 $(-24,305.0)
05 3.1191: Change procedures / equipment / operating conditions $10,000 $250 n/a - - - - - $10,000
-
lb
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,300 - n/a $3,300
119,871
kWh
- - - - - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $37,430 $130,994 n/a $12,914
469,519
kWh
$24,516
-
kW-mo/yr
- - - - - -
TOTAL RECOMMENDED $74,003 $135,044 $17,122
622,508
kWh
$175,858
-
kW-mo/yr
$9,066
-
MMBtu
$(-73,656.0)
-
MMBtu
$93
-
Tgal
$10,000
-
lb
$5,341 $(-69,821.0)
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Water Disposal Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs