Assessment Year | 1998 |
---|---|
Principal Product | Windup clocks |
NAICS |
n/a
|
SIC | 3873: Watches, Clocks, Clockwork Operated Devices, and Parts |
Sales Range | $100 M to 500M |
# of Employees | 650 |
Plant Area |
331,000
ft2
|
Annual Production | 12,500,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $316,734 | 11,517,585 |
kWh
|
$0.028 |
Electricity Demand | $338,371 | 28,160 |
kW-mo/yr
|
$12.02 |
Electricity Fees | $55,383 | - |
|
- |
Natural Gas | $58,932 | 9,603 |
MMBtu
|
$6.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $74,003 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Water Disposal Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $9,935 | - | n/a | - |
$151,342
-
kW-mo/yr
|
- |
$(-73,656.0)
-
MMBtu
|
- | - | $(-15,345.0) | $(-52,406.0) |
02 | 3.4155: Meter waste water | $6,890 | $1,000 | n/a | - | - | - | - | - | - | - | $6,890 |
03 | 2.2111: Install steam trap | $2,103 | $2,800 | n/a | - | - |
$2,010
-
MMBtu
|
- |
$93
-
Tgal
|
- | - | - |
04 | 4.422: Utilize outside contracting | $4,345 | - | n/a |
$908
33,118
kWh
|
- |
$7,056
-
MMBtu
|
- | - | - | $20,686 | $(-24,305.0) |
05 | 3.1191: Change procedures / equipment / operating conditions | $10,000 | $250 | n/a | - | - | - | - | - |
$10,000
-
lb
|
- | - |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,300 | - | n/a |
$3,300
119,871
kWh
|
- | - | - | - | - | - | - |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $37,430 | $130,994 | n/a |
$12,914
469,519
kWh
|
$24,516
-
kW-mo/yr
|
- | - | - | - | - | - |
TOTAL RECOMMENDED | $74,003 | $135,044 |
$17,122
622,508
kWh
|
$175,858
-
kW-mo/yr
|
$9,066
-
MMBtu
|
$(-73,656.0)
-
MMBtu
|
$93
-
Tgal
|
$10,000
-
lb
|
$5,341 | $(-69,821.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Water Disposal Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs