ITAC Assessment: BS0126
ITAC logo
ITAC Assessment: BS0126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Storage
NAICS 424490: Other Grocery and Related Products Merchant Wholesalers
SIC 5149: Groceries and Related Products, Not Elsewhere Classified
Sales Range greater than $500
M
# of Employees 200
Plant Area 685,000
ft2
Annual Production 29,000,000
pieces
Production Hrs. Annual 7,452
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $294,642 4,228,180
kWh
Electricity Demand $79,167 9,590
kW-mo/yr
Natural Gas $90,000 172,275
MMBtu
Waste Disposal Costs
Water Usage $13,000 13,500
Tgal
TOTAL YEARLY COSTS $476,809
RECOMMENDED SAVINGS* $19,413 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $308 $53 $257
3,666
kWh
$51
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,569 $1,440 $2,011
28,741
kWh
$558
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $130 $20 $77
1,094
kWh
$53
-
kW-mo/yr
04 2.2621: Modify refrigeration system to operate at a lower pressure $16,406 $13,000 $16,406
234,368
kWh
-
TOTAL RECOMMENDED $19,413 $14,513 $18,750
267,870
kWh
$663
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs