ITAC Assessment: AM0569
ITAC logo
ITAC Assessment: AM0569
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Mechanical seals and sealing systems
NAICS 339991: Gasket, Packing, and Sealing Device Manufacturing
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 68
Plant Area 8,275
ft2
Annual Production 141,600
pieces
Production Hrs. Annual 5,516
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,638 701,280
kWh
Electricity Demand $10,994 2,279
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,772 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,757

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,635 $11,600 $4,980
52,400
kWh
$655
-
kW-mo/yr
- - -
02 2.8121: Apply for tax-free status for energy purchases $26,812 $2,680 - - - $5,362 $21,450
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,000 $500 $1,770
18,600
kWh
$230
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,755 $460 $280
2,940
kWh
$20
-
kW-mo/yr
$1,455 - -
05 2.3212: Optimize plant power factor $1,670 $5,830 - $1,670
-
kW-mo/yr
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,190 - $1,050
11,060
kWh
$140
-
kW-mo/yr
- - -
07 2.7124: Make a practice of turning off lights when not needed $710 $500 $710
7,500
kWh
- - - -
TOTAL RECOMMENDED $39,772 $21,570 $8,790
92,500
kWh
$2,715
-
kW-mo/yr
$1,455 $5,362 $21,450
TOTAL IMPLEMENTED $31,757 $3,640 $3,100
32,600
kWh
$390
-
kW-mo/yr
$1,455 $5,362 $21,450
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs