Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Surgical and medical instruments and apparatus
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0528 #07 Y:2022 Use or replace with energy efficient substitutes $2,451 $15,000
LE0528 #06 Y:2022 Install compressor air intakes in coolest locations $1,188 $2,000
LE0528 #05 Y:2022 Upgrade obsolete equipment $150,000 $150,000
LE0528 #04 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $1,512 $150
LE0528 #03 Y:2022 Upgrade obsolete equipment $150,000 $90,000
LE0528 #02 Y:2022 Install timers and/or thermostats $2,953 $1,000
LE0528 #01 Y:2022 Reduce the pressure of compressed air to the minimum required $1,359 $40
DL0124 #08 Y:2013 Utilize higher efficiency lamps and/or ballasts $7,125 -
DL0124 #07 Y:2013 Insulate glazing, walls, ceilings, and roofs $760 $1,220
DL0124 #06 Y:2013 Install occupancy sensors $691 $900
DL0124 #05 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $1,680 -
DL0124 #04 Y:2013 Install timers and/or thermostats $700 $180
DL0124 #03 Y:2013 Enhance sensitivity of temperature control and cutoff $340 -
DL0124 #02 Y:2013 Use optimum temperature $490 -
DL0124 #01 Y:2013 Reschedule plant operations or reduce load to avoid peaks $16,900 -
LE0342 #14 Y:2012 Utilize higher efficiency lamps and/or ballasts $6,722 $85,000
LE0342 #13 Y:2012 Improve air circulation with destratification fans / other methods $72,444 $410,000
LE0342 #12 Y:2012 Improve air circulation with destratification fans / other methods $22,316 $58,200
LE0342 #11 Y:2012 Replace existing equipment with more suitable substitutes $601,021 $1,280,000
LE0342 #10 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $5,462 $10,000