Assessment Year | 2014 |
---|---|
Principal Product | Precision Machined Parts |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $5 M to 10M |
# of Employees | 35 |
Plant Area |
60,500
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $56,768 | 446,000 |
kWh
|
$0.13 |
Electricity Demand | $19,720 | 2,260 |
kW-mo/yr
|
$8.73 |
Electricity Fees | $51 | - |
|
- |
Natural Gas | $12,295 | 1,151 |
MMBtu
|
$10.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,686 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,195 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $16,900 | - |
$16,900
135,000
kWh
|
- | |
02 | 2.2211: Use optimum temperature | $490 | - | - |
$490
-
MMBtu
|
|
03 | 2.2223: Enhance sensitivity of temperature control and cutoff | $340 | - |
$340
2,450
kWh
|
- | |
04 | 2.7261: Install timers and/or thermostats | $700 | $180 | - |
$700
-
MMBtu
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,680 | - |
$1,680
12,000
kWh
|
- | |
06 | 2.7135: Install occupancy sensors | $691 | $900 |
$691
7,055
kWh
|
- | |
07 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $760 | $1,220 | - |
$760
-
MMBtu
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,125 | - |
$7,125
50,895
kWh
|
- | |
TOTAL RECOMMENDED | $28,686 | $2,300 |
$26,736
207,400
kWh
|
$1,950
-
MMBtu
|
||
TOTAL IMPLEMENTED | $26,195 | - |
$25,705
197,895
kWh
|
$490
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs