ITAC Assessment: DL0124
ITAC logo
ITAC Assessment: DL0124
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Precision Machined Parts
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 60,500
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,768 446,000
kWh
Electricity Demand $19,720 2,260
kW-mo/yr
Electricity Fees $51 -
Natural Gas $12,295 1,151
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,686 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,195

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $16,900 - $16,900
135,000
kWh
-
02 2.2211: Use optimum temperature $490 - - $490
-
MMBtu
03 2.2223: Enhance sensitivity of temperature control and cutoff $340 - $340
2,450
kWh
-
04 2.7261: Install timers and/or thermostats $700 $180 - $700
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,680 - $1,680
12,000
kWh
-
06 2.7135: Install occupancy sensors $691 $900 $691
7,055
kWh
-
07 2.7491: Insulate glazing, walls, ceilings, and roofs $760 $1,220 - $760
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $7,125 - $7,125
50,895
kWh
-
TOTAL RECOMMENDED $28,686 $2,300 $26,736
207,400
kWh
$1,950
-
MMBtu
TOTAL IMPLEMENTED $26,195 - $25,705
197,895
kWh
$490
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs