ITAC Assessment: LE0342
ITAC logo
ITAC Assessment: LE0342
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Medical Devices
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 1,000
Plant Area 700,000
ft2
Annual Production 725,000
pieces
Production Hrs. Annual 4,080
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,337,421 26,234,796
kWh
Electricity Demand $153,145 68,657
kW-mo/yr
Electricity Fees $518,987 -
Natural Gas $1,147,032 113,493
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,006,047 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $347,711

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $220 $925 $220
2,475
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,151 $17,500 $3,411
38,322
kWh
$281
-
kW-mo/yr
- $459
03 2.4221: Install compressor air intakes in coolest locations $3,098 $1,800 $2,960
33,259
kWh
$138
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,070 $1,000 $5,653
63,514
kWh
$417
-
kW-mo/yr
- -
05 2.4226: Use / purchase optimum sized compressor $20,149 $48,500 $20,149
226,388
kWh
- - -
06 2.1233: Analyze flue gas for proper air/fuel ratio $13,433 $40,000 - - $13,433
-
MMBtu
-
07 2.2442: Preheat combustion air with waste heat $24,116 $60,000 - - $24,116
-
MMBtu
-
08 2.2113: Repair or replace steam traps $1,008 $675 - - $1,008
-
MMBtu
-
09 2.1224: Replace boiler $225,837 $230,000 - - $225,837
-
MMBtu
-
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,462 $10,000 $5,107
57,386
kWh
$355
-
kW-mo/yr
- -
11 4.652: Replace existing equipment with more suitable substitutes $601,021 $1,280,000 $540,656
6,074,784
kWh
$10,365
-
kW-mo/yr
- $50,000
12 2.7243: Improve air circulation with destratification fans / other methods $22,316 $58,200 $19,731
221,694
kWh
$2,585
-
kW-mo/yr
- -
13 2.7243: Improve air circulation with destratification fans / other methods $72,444 $410,000 $64,053
719,700
kWh
$8,391
-
kW-mo/yr
- -
14 2.7142: Utilize higher efficiency lamps and/or ballasts $6,722 $85,000 $4,354
48,922
kWh
$301
-
kW-mo/yr
- $2,067
TOTAL RECOMMENDED $1,006,047 $2,243,600 $666,294
7,486,444
kWh
$22,833
-
kW-mo/yr
$264,394
-
MMBtu
$52,526
TOTAL IMPLEMENTED $347,711 $843,175 $71,818
806,944
kWh
$8,973
-
kW-mo/yr
$264,394
-
MMBtu
$2,526
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs