| Assessment Year | 2022 |
|---|---|
| Principal Product | Sterilization Case |
| NAICS | 339112: Surgical and Medical Instrument Manufacturing |
| SIC | 3841: Surgical and Medical Instruments and Apparatus |
| Sales Range | $10 M to 50M |
| # of Employees | 40 |
| Plant Area |
60,000
ft2
|
| Annual Production | 80,000
units
|
| Production Hrs. Annual | 3,003
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $64,360 | 522,468 |
kWh
|
$0.12 |
| Electricity Demand | $15,367 | 2,426 |
kW-mo/yr
|
$6.33 |
| Electricity Fees | $4,450 | - |
|
- |
| Natural Gas | $19,811 | 2,757 |
MMBtu
|
$7.19 |
| TOTAL YEARLY COSTS | $103,988 | |||
| RECOMMENDED SAVINGS* | $309,463 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $306,916 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,359 | $40 |
$1,125
9,144
kWh
|
$234
-
kW-mo/yr
|
- | - | |
| 02 | 2.7261: Install timers and/or thermostats | $2,953 | $1,000 |
$1,910
15,578
kWh
|
- |
$1,043
-
MMBtu
|
- | |
| 03 | 2.4321: Upgrade obsolete equipment | $150,000 | $90,000 | - | - | - | $150,000 | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,512 | $150 |
$1,254
10,195
kWh
|
$258
-
kW-mo/yr
|
- | - | |
| 05 | 2.4321: Upgrade obsolete equipment | $150,000 | $150,000 | - | - | - | $150,000 | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $1,188 | $2,000 |
$986
8,012
kWh
|
$202
-
kW-mo/yr
|
- | - | |
| 07 | 2.4322: Use or replace with energy efficient substitutes | $2,451 | $15,000 |
$2,033
16,526
kWh
|
$418
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $309,463 | $258,190 |
$7,308
59,455
kWh
|
$1,112
-
kW-mo/yr
|
$1,043
-
MMBtu
|
$300,000 | ||
| TOTAL IMPLEMENTED | $306,916 | $256,150 |
$5,197
42,299
kWh
|
$676
-
kW-mo/yr
|
$1,043
-
MMBtu
|
$300,000 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs