ITAC Assessment: OK0215
ITAC logo
ITAC Assessment: OK0215
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PRECISION MACHINE PARTS
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area
n/a
Annual Production 500
pieces
Production Hrs. Annual 5,616
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,852 555,979
kWh
Natural Gas $8,397 1,886
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,840 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $211

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,613 $229 $1,613
32,825
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $538 $631 $538
10,551
kWh
- -
03 2.7231: Use radiant heater for spot heating $2,478 $7,000 - $2,478
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $211 - $251
7,034
kWh
- $(-40.0)
TOTAL RECOMMENDED $4,840 $7,860 $2,402
50,410
kWh
$2,478
-
MMBtu
$(-40.0)
TOTAL IMPLEMENTED $211 - $251
7,034
kWh
- $(-40.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs