98
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NT0038 #05 Y:2024 | 05 | 2024 | Apply for investment incentives | $52,835 | $5,000 | |
| NT0038 #04 Y:2024 | 04 | 2024 | Reduce the pressure of compressed air to the minimum required | $3,311 | - | |
| NT0038 #03 Y:2024 | 03 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,524 | $5,609 | |
| NT0038 #02 Y:2024 | 02 | 2024 | Lower temperature during the winter season and vice-versa | $7,913 | - | |
| NT0038 #01 Y:2024 | 01 | 2024 | Utilize higher efficiency lamps and/or ballasts | $390 | $370 | |
| AM0675 #07 Y:2014 | 07 | 2014 | Insulate bare equipment | $250 | $130 | |
| AM0675 #06 Y:2014 | 06 | 2014 | Apply for tax-free status for energy purchases | $14,950 | $2,000 | |
| AM0675 #05 Y:2014 | 05 | 2014 | Reschedule plant operations or reduce load to avoid peaks | $4,250 | - | |
| AM0675 #04 Y:2014 | 04 | 2014 | Install equipment (eg compactor) to reduce disposal costs | $5,990 | - | |
| AM0675 #03 Y:2014 | 03 | 2014 | Reduce the pressure of compressed air to the minimum required | $6,670 | $610 | |
| AM0675 #02 Y:2014 | 02 | 2014 | Use computer programs to optimize hvac performance | $8,020 | $60 | |
| AM0675 #01 Y:2014 | 01 | 2014 | Use or replace with energy efficient substitutes | $31,650 | $2,210 | |
| AM0617 #09 Y:2012 | 09 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $630 | $300 | |
| AM0617 #08 Y:2012 | 08 | 2012 | Utilize higher efficiency lamps and/or ballasts | $911 | $5,377 | |
| AM0617 #07 Y:2012 | 07 | 2012 | Recycle white water | $1,161 | $7,179 | |
| AM0617 #06 Y:2012 | 06 | 2012 | Reduce the pressure of compressed air to the minimum required | $1,871 | $64 | |
| AM0617 #05 Y:2012 | 05 | 2012 | Install occupancy sensors | $2,056 | $1,562 | |
| AM0617 #04 Y:2012 | 04 | 2012 | Modify process to reduce material use/cost | $2,146 | - | |
| AM0617 #03 Y:2012 | 03 | 2012 | Utilize higher efficiency lamps and/or ballasts | $6,264 | $2,775 | |
| AM0617 #02 Y:2012 | 02 | 2012 | Recover waste heat from equipment | $153,000 | $375,000 |