| Assessment Year | 2012 |
|---|---|
| Principal Product | Breast implants |
| NAICS | 339113: Surgical Appliance and Supplies Manufacturing |
| SIC | 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies |
| Sales Range | $100 M to 500M |
| # of Employees | 400 |
| Plant Area |
130,000
ft2
|
| Annual Production | 545,000
pieces
|
| Production Hrs. Annual | 5,952
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $703,148 | 12,031,827 |
kWh
|
$0.058 |
| Electricity Demand | $172,533 | 24,690 |
kW-mo/yr
|
$6.99 |
| Electricity Fees | $1,449 | - |
|
- |
| Natural Gas | $341,162 | 80,778 |
MMBtu
|
$4.22 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $359,825 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,039 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.625: Develop standard operating procedures | $191,786 | $6,200 |
$(-1,214.0)
(-20,931)
kWh
|
- | - | - | - | - | $193,000 | |
| 02 | 2.2437: Recover waste heat from equipment | $153,000 | $375,000 | - | - |
$153,000
-
MMBtu
|
- | - | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,264 | $2,775 |
$931
16,924
kWh
|
$121
-
kW-mo/yr
|
- | $5,212 | - | - | - | |
| 04 | 4.131: Modify process to reduce material use/cost | $2,146 | - | - | - | - | - | $2,146 | - | - | |
| 05 | 2.7135: Install occupancy sensors | $2,056 | $1,562 |
$939
16,761
kWh
|
$1,117
-
kW-mo/yr
|
- | - | - | - | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,871 | $64 |
$1,672
28,819
kWh
|
$199
-
kW-mo/yr
|
- | - | - | - | - | |
| 07 | 3.5131: Recycle white water | $1,161 | $7,179 | - | - | - | - | - |
$1,161
-
Tgal
|
- | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $911 | $5,377 |
$581
11,182
kWh
|
$330
-
kW-mo/yr
|
- | - | - | - | - | |
| 09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $630 | $300 |
$530
9,146
kWh
|
$100
-
kW-mo/yr
|
- | - | - | - | - | |
| TOTAL RECOMMENDED | $359,825 | $398,457 |
$3,439
61,901
kWh
|
$1,867
-
kW-mo/yr
|
$153,000
-
MMBtu
|
$5,212 | $2,146 |
$1,161
-
Tgal
|
$193,000 | ||
| TOTAL IMPLEMENTED | $15,039 | $17,257 |
$4,653
82,832
kWh
|
$1,867
-
kW-mo/yr
|
- | $5,212 | $2,146 |
$1,161
-
Tgal
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs