Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,876

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Surgical, medical, and dental instruments and supplies
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0447 #06 Y:2025 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $2,030,279 $11,484,200
MS0447 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $144,047 $116,128
MS0447 #04 Y:2025 Replace obsolete burners with more efficient ones $43,724 $145,930
MS0447 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $56,915 $6,958
MS0447 #02 Y:2025 Upgrade obsolete equipment $80,000 $30,005
MS0447 #01 Y:2025 Use solar heat to make electricty $668,474 $6,707,386
OR0806 #05 Y:2025 Adopt in-house material generation $15,683 $76,301
OR0806 #04 Y:2025 Replace existing hvac unit with high efficiency model $1,542 $5,699
OR0806 #03 Y:2025 Insulate bare equipment $3,880 $211
OR0806 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $4,490 $1,927
OR0806 #01 Y:2025 Use solar heat to make electricty $56,788 $960,069
MI0454 #07 Y:2024 Replace existing hvac unit with high efficiency model $22,309 $111,252
MI0454 #06 Y:2024 Use solar heat to make electricty $78,625 $364,596
MI0454 #05 Y:2024 Install vinyl strip / high speed / air curtain doors $905 $4,156
MI0454 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $6,118 $11,168
MI0454 #03 Y:2024 Turn off equipment when not in use $10,560 $7,300
MI0454 #02 Y:2024 Use optimum temperature $31,534 $960
MI0454 #01 Y:2024 Reschedule plant operations or reduce load to avoid peaks $2,818 -
SU0566 #09 Y:2024 Use solar heat to make electricty $41,143 $386,971
SU0566 #08 Y:2024 Install occupancy sensors $1,117 $5,009