Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

233

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Optical instruments and lenses
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1101 #11 Y:2024 Optimize plant power factor $1,101 $4,400
UD1101 #10 Y:2024 Install occupancy sensors $94 -
UD1101 #09 Y:2024 Reduce illumination to minimum necessary levels $310 $1,350
UD1101 #08 Y:2024 Utilize higher efficiency lamps and/or ballasts $430 $1,040
UD1101 #07 Y:2024 Recover waste heat from equipment $2,622 $4,975
UD1101 #06 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,266 $952
UD1101 #05 Y:2024 Reduce the pressure of compressed air to the minimum required $1,284 -
UD1101 #04 Y:2024 Install compressor air intakes in coolest locations $1,619 $1,015
UD1101 #03 Y:2024 Eliminate or reduce compressed air usage $4,750 $7,500
UD1101 #02 Y:2024 Eliminate or reduce compressed air usage $9,997 $6,792
UD1101 #01 Y:2024 Turn off equipment when not in use $8,143 -
UF0624 #08 Y:2024 Level zero – install control systems for existing equipment $23,221 $60,000
UF0624 #07 Y:2024 Replace old machine with new automatic multi-station tool $38,400 $100,000
UF0624 #06 Y:2024 Upgrade controls on compressors $5,844 $6,000
UF0624 #05 Y:2024 Eliminate or reduce compressed air usage $8,280 -
UF0624 #04 Y:2024 Utilize controls to operate equipment only when needed $12,033 $25,340
UF0624 #03 Y:2024 Use battery storage for demand control $11,217 $21,658
UF0624 #02 Y:2024 Use fossil fuel powered generator during peak demand periods $20,908 $14,359
UF0624 #01 Y:2024 Use solar heat to make electricty $59,131 $322,608
LE0527 #07 Y:2022 Replace existing chiller with high efficiency model $16,154 $160,000