Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

257

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Optical instruments and lenses
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0589 #14 Y:2025 Insulate bare equipment $69 $384
SU0589 #13 Y:2025 Install / repair insulation on condensate lines $17 $68
SU0589 #12 Y:2025 Insulate bare equipment $50 $185
SU0589 #11 Y:2025 Install vinyl strip / high speed / air curtain doors $1,043 $3,573
SU0589 #10 Y:2025 Install an uninteruptable power supply $160,000 $480,000
SU0589 #09 Y:2025 Use or replace with energy efficient substitutes $975 $1,642
SU0589 #08 Y:2025 Conserve energy by efficient use of vending machines $1,631 $1,642
SU0589 #07 Y:2025 Install occupancy sensors $2,093 $1,943
SU0589 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $41,161 $16,667
SU0589 #05 Y:2025 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $37,186 $3,500
SU0589 #04 Y:2025 Use or replace with energy efficient substitutes $4,120 $313
SU0589 #03 Y:2025 Eliminate or reduce compressed air usage $37,179 -
SU0589 #02 Y:2025 Disconnect ballasts $3,513 -
SU0589 #01 Y:2025 Reschedule plant operations or reduce load to avoid peaks $18,704 -
UD1101 #11 Y:2024 Optimize plant power factor $1,101 $4,400
UD1101 #10 Y:2024 Install occupancy sensors $94 -
UD1101 #09 Y:2024 Reduce illumination to minimum necessary levels $310 $1,350
UD1101 #08 Y:2024 Utilize higher efficiency lamps and/or ballasts $430 $1,040
UD1101 #07 Y:2024 Recover waste heat from equipment $2,622 $4,975
UD1101 #06 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,266 $952