ITAC Assessment: UF0624
ITAC logo
ITAC Assessment: UF0624
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Optical Componenents
NAICS 333314: Optical Instrument and Lens Manufacturing
SIC 3827: Optical Instruments and Lenses
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 41,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 4,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $232,673 2,669,047
kWh
Electricity Demand $66,485 12,548
kW-mo/yr
Electricity Fees $32,939 -
TOTAL YEARLY COSTS $332,097
RECOMMENDED SAVINGS* $179,034 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $59,131 $322,608 $54,045
621,206
kWh
$5,086
-
kW-mo/yr
-
02 2.3192: Use fossil fuel powered generator during peak demand periods $20,908 $14,359 $16,254
186,833
kWh
$4,654
-
kW-mo/yr
-
03 2.3141: Use battery storage for demand control $11,217 $21,658 $783
9,000
kWh
- $10,434
04 2.6231: Utilize controls to operate equipment only when needed $12,033 $25,340 $12,033
138,317
kWh
- -
05 2.4239: Eliminate or reduce compressed air usage $8,280 - $8,280
95,171
kWh
- -
06 2.4224: Upgrade controls on compressors $5,844 $6,000 $5,844
67,177
kWh
- -
07 4.112: Replace old machine with new automatic multi-station tool $38,400 $100,000 - - $38,400
08 4.661: Level zero – install control systems for existing equipment $23,221 $60,000 $23,221
266,905
kWh
- -
TOTAL RECOMMENDED $179,034 $549,965 $120,460
1,384,609
kWh
$9,740
-
kW-mo/yr
$48,834
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs