Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Laboratory analytical instruments
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0229 #06 Y:2023 Replace existing hvac unit with high efficiency model $104,868 $500,000
DL0229 #05 Y:2023 Use heat pump for space conditioning $2,948 $14,000
DL0229 #04 Y:2023 Install timers on light switches in little used areas $44,923 $1,275
DL0229 #03 Y:2023 Use optimum temperature $8,303 -
DL0229 #02 Y:2023 Reduce ventilation air $32,353 -
DL0229 #01 Y:2023 Turn off equipment during breaks, reduce operating time $61,397 -
DL0162 #08 Y:2015 Utilize higher efficiency lamps and/or ballasts $7,930 $29,230
DL0162 #07 Y:2015 Utilize controls to operate equipment only when needed $1,730 $1,820
DL0162 #06 Y:2015 Replace city water with recycled water via cooling tower $18,175 $10,500
DL0162 #05 Y:2015 Turn off equipment during breaks, reduce operating time $1,940 $510
DL0162 #04 Y:2015 Turn off equipment when not in use $3,605 $800
DL0162 #03 Y:2015 Reduce ventilation air $2,430 $340
DL0162 #02 Y:2015 Turn off equipment during breaks, reduce operating time $7,660 -
DL0162 #01 Y:2015 Reduce space conditioning during non-working hours $22,170 -
DL0160 #06 Y:2015 Utilize higher efficiency lamps and/or ballasts $25,935 $211,395
DL0160 #05 Y:2015 Utilize higher efficiency lamps and/or ballasts $21,525 $99,395
DL0160 #04 Y:2015 Recover waste heat from equipment $18,520 $65,650
DL0160 #03 Y:2015 Reduce ventilation air $32,810 $1,560
DL0160 #02 Y:2015 Turn off equipment during breaks, reduce operating time $2,550 -
DL0160 #01 Y:2015 Reduce space conditioning during non-working hours $25,680 -