28
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Laboratory analytical instruments | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| DL0229 #06 Y:2023 | 06 | 2023 | Replace existing hvac unit with high efficiency model | $104,868 | $500,000 | |
| DL0229 #05 Y:2023 | 05 | 2023 | Use heat pump for space conditioning | $2,948 | $14,000 | |
| DL0229 #04 Y:2023 | 04 | 2023 | Install timers on light switches in little used areas | $44,923 | $1,275 | |
| DL0229 #03 Y:2023 | 03 | 2023 | Use optimum temperature | $8,303 | - | |
| DL0229 #02 Y:2023 | 02 | 2023 | Reduce ventilation air | $32,353 | - | |
| DL0229 #01 Y:2023 | 01 | 2023 | Turn off equipment during breaks, reduce operating time | $61,397 | - | |
| DL0162 #08 Y:2015 | 08 | 2015 | Utilize higher efficiency lamps and/or ballasts | $7,930 | $29,230 | |
| DL0162 #07 Y:2015 | 07 | 2015 | Utilize controls to operate equipment only when needed | $1,730 | $1,820 | |
| DL0162 #06 Y:2015 | 06 | 2015 | Replace city water with recycled water via cooling tower | $18,175 | $10,500 | |
| DL0162 #05 Y:2015 | 05 | 2015 | Turn off equipment during breaks, reduce operating time | $1,940 | $510 | |
| DL0162 #04 Y:2015 | 04 | 2015 | Turn off equipment when not in use | $3,605 | $800 | |
| DL0162 #03 Y:2015 | 03 | 2015 | Reduce ventilation air | $2,430 | $340 | |
| DL0162 #02 Y:2015 | 02 | 2015 | Turn off equipment during breaks, reduce operating time | $7,660 | - | |
| DL0162 #01 Y:2015 | 01 | 2015 | Reduce space conditioning during non-working hours | $22,170 | - | |
| DL0160 #06 Y:2015 | 06 | 2015 | Utilize higher efficiency lamps and/or ballasts | $25,935 | $211,395 | |
| DL0160 #05 Y:2015 | 05 | 2015 | Utilize higher efficiency lamps and/or ballasts | $21,525 | $99,395 | |
| DL0160 #04 Y:2015 | 04 | 2015 | Recover waste heat from equipment | $18,520 | $65,650 | |
| DL0160 #03 Y:2015 | 03 | 2015 | Reduce ventilation air | $32,810 | $1,560 | |
| DL0160 #02 Y:2015 | 02 | 2015 | Turn off equipment during breaks, reduce operating time | $2,550 | - | |
| DL0160 #01 Y:2015 | 01 | 2015 | Reduce space conditioning during non-working hours | $25,680 | - |