ITAC Assessment: DL0229
ITAC logo
ITAC Assessment: DL0229
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product life sciences instrumentation
NAICS 334516: Analytical Laboratory Instrument Manufacturing
SIC 3826: Laboratory Analytical Instruments
Sales Range $50
M
to 100
M
# of Employees 490
Plant Area 354,000
ft2
Annual Production 200
units
Production Hrs. Annual 3,640
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $266,934 3,114,056
kWh
Electricity Demand $70,870 15,085
kW-mo/yr
Electricity Fees $8,294 -
Natural Gas $429,996 72,317
MMBtu
TOTAL YEARLY COSTS $776,094
RECOMMENDED SAVINGS* $254,792 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,353

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $61,397 - $61,397
568,493
kWh
-
02 2.7314: Reduce ventilation air $32,353 - $18,693
173,080
kWh
$13,660
-
MMBtu
03 2.2211: Use optimum temperature $8,303 - $17,012
157,517
kWh
$(-8,709.0)
-
MMBtu
04 2.7132: Install timers on light switches in little used areas $44,923 $1,275 $44,923
415,956
kWh
-
05 2.7234: Use heat pump for space conditioning $2,948 $14,000 $1,341
12,420
kWh
$1,607
-
MMBtu
06 2.7232: Replace existing hvac unit with high efficiency model $104,868 $500,000 $77,496
717,554
kWh
$27,372
-
MMBtu
TOTAL RECOMMENDED $254,792 $515,275 $220,862
2,045,020
kWh
$33,930
-
MMBtu
TOTAL IMPLEMENTED $32,353 - $18,693
173,080
kWh
$13,660
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs