| Assessment Year | 2023 |
|---|---|
| Principal Product | life sciences instrumentation |
| NAICS | 334516: Analytical Laboratory Instrument Manufacturing |
| SIC | 3826: Laboratory Analytical Instruments |
| Sales Range | $50 M to 100M |
| # of Employees | 490 |
| Plant Area |
354,000
ft2
|
| Annual Production | 200
units
|
| Production Hrs. Annual | 3,640
hrs
|
| Location (State) | Delaware |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $266,934 | 3,114,056 |
kWh
|
$0.086 |
| Electricity Demand | $70,870 | 15,085 |
kW-mo/yr
|
$4.70 |
| Electricity Fees | $8,294 | - |
|
- |
| Natural Gas | $429,996 | 72,317 |
MMBtu
|
$5.95 |
| TOTAL YEARLY COSTS | $776,094 | |||
| RECOMMENDED SAVINGS* | $254,792 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $32,353 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6212: Turn off equipment during breaks, reduce operating time | $61,397 | - |
$61,397
568,493
kWh
|
- | |
| 02 | 2.7314: Reduce ventilation air | $32,353 | - |
$18,693
173,080
kWh
|
$13,660
-
MMBtu
|
|
| 03 | 2.2211: Use optimum temperature | $8,303 | - |
$17,012
157,517
kWh
|
$(-8,709.0)
-
MMBtu
|
|
| 04 | 2.7132: Install timers on light switches in little used areas | $44,923 | $1,275 |
$44,923
415,956
kWh
|
- | |
| 05 | 2.7234: Use heat pump for space conditioning | $2,948 | $14,000 |
$1,341
12,420
kWh
|
$1,607
-
MMBtu
|
|
| 06 | 2.7232: Replace existing hvac unit with high efficiency model | $104,868 | $500,000 |
$77,496
717,554
kWh
|
$27,372
-
MMBtu
|
|
| TOTAL RECOMMENDED | $254,792 | $515,275 |
$220,862
2,045,020
kWh
|
$33,930
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $32,353 | - |
$18,693
173,080
kWh
|
$13,660
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs