ITAC Assessment: DL0162
ITAC logo
ITAC Assessment: DL0162
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Analytical Equipment
NAICS 334516: Analytical Laboratory Instrument Manufacturing
SIC 3826: Laboratory Analytical Instruments
Sales Range $50
M
to 100
M
# of Employees 85
Plant Area 37,500
ft2
Annual Production 30,000
pieces
Production Hrs. Annual 7,114
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $363,335 4,003,929
kWh
Natural Gas $80,146 8,809
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,640 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,270

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 2.7224: Reduce space conditioning during non-working hours $22,170 - $5,700
62,605
kWh
$16,470
-
MMBtu
-
02 2.6212: Turn off equipment during breaks, reduce operating time $7,660 - $880
9,680
kWh
$6,780
-
MMBtu
-
03 2.7314: Reduce ventilation air $2,430 $340 $1,390
15,280
kWh
$1,040
-
MMBtu
-
04 2.6218: Turn off equipment when not in use $3,605 $800 $2,640
29,040
kWh
- $965
-
gal
05 2.6212: Turn off equipment during breaks, reduce operating time $1,940 $510 $1,940
21,330
kWh
- -
06 3.4114: Replace city water with recycled water via cooling tower $18,175 $10,500 $(-560.0)
(-6,170)
kWh
- $18,735
-
gal
07 2.6231: Utilize controls to operate equipment only when needed $1,730 $1,820 - $1,730
-
MMBtu
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $7,930 $29,230 $7,930
87,130
kWh
- -
TOTAL RECOMMENDED $65,640 $43,200 $19,920
218,895
kWh
$26,020
-
MMBtu
$19,700
-
gal
TOTAL IMPLEMENTED $61,270 $42,350 $16,590
182,285
kWh
$24,980
-
MMBtu
$19,700
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs