Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

249

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Laboratory analytical instruments
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0553 #08 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,024 $673
SU0553 #07 Y:2024 Install compressor air intakes in coolest locations $1,383 $332
SU0553 #06 Y:2024 Install vinyl strip / high speed / air curtain doors $2,465 $106
SU0553 #05 Y:2024 Use or replace with energy efficient substitutes $1,809 $75
SU0553 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,900 $35
SU0553 #03 Y:2024 Recover waste heat from equipment $7,580 $118
SU0553 #02 Y:2024 Apply for tax-free status for energy purchases $36,557 $168
SU0553 #01 Y:2024 Reschedule plant operations or reduce load to avoid peaks $7,750 -
TT0305 #08 Y:2023 Utilize higher efficiency lamps and/or ballasts $82 $174
TT0305 #07 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $212 $60
TT0305 #06 Y:2023 Reduce the pressure of compressed air to the minimum required $637 $125
TT0305 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $4,366 $3,000
TT0305 #04 Y:2023 Air condition only space necessary $6,707 $1,060
TT0305 #03 Y:2023 Eliminate leaks in water lines and valves $12,922 $5,000
TT0305 #02 Y:2023 Adopt in-house material generation $34,931 $146,400
TT0305 #01 Y:2023 Adopt in-house material generation $50,976 $15,000
DL0229 #06 Y:2023 Replace existing hvac unit with high efficiency model $104,868 $500,000
DL0229 #05 Y:2023 Use heat pump for space conditioning $2,948 $14,000
DL0229 #04 Y:2023 Install timers on light switches in little used areas $44,923 $1,275
DL0229 #03 Y:2023 Use optimum temperature $8,303 -