ITAC Assessment: SU0553
ITAC logo
ITAC Assessment: SU0553
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Optical Components
NAICS 334516: Analytical Laboratory Instrument Manufacturing
SIC 3826: Laboratory Analytical Instruments
Sales Range $1
M
to 5
M
# of Employees 80
Plant Area 70,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 4,550
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $376,829 4,880,004
kWh
Electricity Demand $154,990 8,975
kW-mo/yr
Electricity Fees $58,328 -
Natural Gas $25,501 3,926
MMBtu
Other Gas $2,960 1
MMBtu
TOTAL YEARLY COSTS $618,607
RECOMMENDED SAVINGS* $69,813 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,750 - - $7,750
-
kW-mo/yr
- - -
02 2.8121: Apply for tax-free status for energy purchases $36,557 $168 - - - - $36,557
03 2.2437: Recover waste heat from equipment $7,580 $118 - - $7,580
-
MMBtu
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,900 $35 $1,900
24,829
kWh
- - - -
05 2.4322: Use or replace with energy efficient substitutes $1,809 $75 $884
11,475
kWh
$1,243
-
kW-mo/yr
$(-317.9)
-
MMBtu
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $2,465 $106 - - $2,465
-
MMBtu
- -
07 2.4221: Install compressor air intakes in coolest locations $1,383 $332 $1,383
17,955
kWh
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,024 $673 $587
7,621
kWh
$180
-
kW-mo/yr
- $257 -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $5,341 $3,819 $3,165
41,101
kWh
$1,862
-
kW-mo/yr
- $315 -
10 2.7447: Install vinyl strip / high speed / air curtain doors $2,522 $2,450 $(-35.0)
(-455)
kWh
- $2,557
-
MMBtu
- -
11 2.7224: Reduce space conditioning during non-working hours $295 $454 - - $295
-
MMBtu
- -
12 2.6211: Conserve energy by efficient use of vending machines $283 $530 $283
3,679
kWh
- - - -
13 2.7441: Replace broken windows and/or window sash $520 $1,116 - - $520
-
MMBtu
- -
14 2.2136: Install / repair insulation on steam lines $383 $1,829 - - $383
-
MMBtu
- -
TOTAL RECOMMENDED $69,813 $11,705 $8,166
106,205
kWh
$11,035
-
kW-mo/yr
$13,483
-
MMBtu
$572 $36,557
TOTAL IMPLEMENTED - - - - - - -