Assessment Year | 2024 |
---|---|
Principal Product | Optical Components |
NAICS | 334516: Analytical Laboratory Instrument Manufacturing |
SIC | 3826: Laboratory Analytical Instruments |
Sales Range | $1 M to 5M |
# of Employees | 80 |
Plant Area |
70,000
ft2
|
Annual Production | 1,000
units
|
Production Hrs. Annual | 4,550
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $376,829 | 4,880,004 |
kWh
|
$0.077 |
Electricity Demand | $154,990 | 8,975 |
kW-mo/yr
|
$17.27 |
Electricity Fees | $58,328 | - |
|
- |
Natural Gas | $25,501 | 3,926 |
MMBtu
|
$6.50 |
Other Gas | $2,960 | 1 |
MMBtu
|
$2,960.15 |
TOTAL YEARLY COSTS | $618,607 | |||
RECOMMENDED SAVINGS* | $69,813 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $7,750 | - | - |
$7,750
-
kW-mo/yr
|
- | - | - | |
02 | 2.8121: Apply for tax-free status for energy purchases | $36,557 | $168 | - | - | - | - | $36,557 | |
03 | 2.2437: Recover waste heat from equipment | $7,580 | $118 | - | - |
$7,580
-
MMBtu
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,900 | $35 |
$1,900
24,829
kWh
|
- | - | - | - | |
05 | 2.4322: Use or replace with energy efficient substitutes | $1,809 | $75 |
$884
11,475
kWh
|
$1,243
-
kW-mo/yr
|
$(-317.9)
-
MMBtu
|
- | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,465 | $106 | - | - |
$2,465
-
MMBtu
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $1,383 | $332 |
$1,383
17,955
kWh
|
- | - | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,024 | $673 |
$587
7,621
kWh
|
$180
-
kW-mo/yr
|
- | $257 | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,341 | $3,819 |
$3,165
41,101
kWh
|
$1,862
-
kW-mo/yr
|
- | $315 | - | |
10 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,522 | $2,450 |
$(-35.0)
(-455)
kWh
|
- |
$2,557
-
MMBtu
|
- | - | |
11 | 2.7224: Reduce space conditioning during non-working hours | $295 | $454 | - | - |
$295
-
MMBtu
|
- | - | |
12 | 2.6211: Conserve energy by efficient use of vending machines | $283 | $530 |
$283
3,679
kWh
|
- | - | - | - | |
13 | 2.7441: Replace broken windows and/or window sash | $520 | $1,116 | - | - |
$520
-
MMBtu
|
- | - | |
14 | 2.2136: Install / repair insulation on steam lines | $383 | $1,829 | - | - |
$383
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $69,813 | $11,705 |
$8,166
106,205
kWh
|
$11,035
-
kW-mo/yr
|
$13,483
-
MMBtu
|
$572 | $36,557 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs