ITAC Assessment: AR0117
ITAC logo
ITAC Assessment: AR0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Signs
NAICS
n/a
SIC 3993: Signs and Advertising Specialties
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 170,000
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 4,367
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,154 1,436,401
kWh
Electricity Demand $57,921 4,144
kW-mo/yr
Natural Gas $26,281 4,948
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $144,766 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $89,292

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $741 $250 $369
9,672
kWh
$372
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,697 $130 $3,330
87,632
kWh
$3,367
-
kW-mo/yr
- - -
03 2.4133: Use most efficient type of electric motors $1,002 $1,830 $524
13,775
kWh
$478
-
kW-mo/yr
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $387 - $203
5,275
kWh
$184
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,185 $517 $626
16,413
kWh
$559
-
kW-mo/yr
- - -
06 2.7111: Reduce illumination to minimum necessary levels $487 $420 $242
6,448
kWh
$245
-
kW-mo/yr
- - -
07 2.3136: Overlap custodial services with normal day hours $840 $150 $840
22,274
kWh
- - - -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $12,784 $8,000 - - - $12,784
-
lb
-
09 3.8143: Recycle cleaning solvent and reuse $4,637 $6,150 - - $4,637
-
gal
- -
10 4.423: Move product using mechanical means $75,030 $60,000 $(-54.0)
(-586)
kWh
- - - $75,084
11 4.423: Move product using mechanical means $40,976 $54,000 - - - - $40,976
TOTAL RECOMMENDED $144,766 $131,447 $6,080
160,903
kWh
$5,205
-
kW-mo/yr
$4,637
-
gal
$12,784
-
lb
$116,060
TOTAL IMPLEMENTED $89,292 $68,877 $4,795
126,906
kWh
$4,776
-
kW-mo/yr
$4,637
-
gal
- $75,084
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs