ITAC Assessment: TT0305
ITAC logo
ITAC Assessment: TT0305
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Germanium Detector Systems
NAICS 334516: Analytical Laboratory Instrument Manufacturing
SIC 3826: Laboratory Analytical Instruments
Sales Range $100
M
to 500
M
# of Employees 270
Plant Area 112,000
ft2
Annual Production 2,600
units
Production Hrs. Annual 6,188
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $490,454 6,409,950
kWh
Electricity Demand $173,253 10,114
kW-mo/yr
Natural Gas $24,283 1,687
MMBtu
Waste Disposal Costs
Water Usage $53,764 8,651
Tgal
Water Disposal $72,313 6,063
Tgal
TOTAL YEARLY COSTS $814,067
RECOMMENDED SAVINGS* $110,833 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,478

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Primary Raw Material Savings
01 4.212: Adopt in-house material generation $50,976 $15,000 $(-4,047.0)
(-52,560)
kWh
$(-2,136.0)
-
kW-mo/yr
- $57,159
02 4.212: Adopt in-house material generation $34,931 $146,400 $(-157.0)
(-2,038)
kWh
- - $35,088
03 3.4154: Eliminate leaks in water lines and valves $12,922 $5,000 - - $12,922
-
Tgal
-
04 2.7229: Air condition only space necessary $6,707 $1,060 $6,707
87,113
kWh
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,366 $3,000 $3,049
39,603
kWh
$1,317
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $637 $125 $445
5,774
kWh
$192
-
kW-mo/yr
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $212 $60 $212
2,753
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $82 $174 $23
297
kWh
$60
-
kW-mo/yr
- -
TOTAL RECOMMENDED $110,833 $170,819 $6,232
80,942
kWh
$(-567.4)
-
kW-mo/yr
$12,922
-
Tgal
$92,247
TOTAL IMPLEMENTED $20,478 $6,245 $7,364
95,640
kWh
$192
-
kW-mo/yr
$12,922
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Usage Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs