Assessment Year | 2023 |
---|---|
Principal Product | Germanium Detector Systems |
NAICS | 334516: Analytical Laboratory Instrument Manufacturing |
SIC | 3826: Laboratory Analytical Instruments |
Sales Range | $100 M to 500M |
# of Employees | 270 |
Plant Area |
112,000
ft2
|
Annual Production | 2,600
units
|
Production Hrs. Annual | 6,188
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $490,454 | 6,409,950 |
kWh
|
$0.077 | |
Electricity Demand | $173,253 | 10,114 |
kW-mo/yr
|
$17.13 | |
Natural Gas | $24,283 | 1,687 |
MMBtu
|
$14.39 | |
Waste Disposal Costs | |||||
Water Usage | $53,764 | 8,651 |
Tgal
|
$6.21 | |
Water Disposal | $72,313 | 6,063 |
Tgal
|
$11.93 | |
TOTAL YEARLY COSTS | $814,067 | ||||
RECOMMENDED SAVINGS* | $110,833 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $20,478 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.212: Adopt in-house material generation | $50,976 | $15,000 |
$(-4,047.0)
(-52,560)
kWh
|
$(-2,136.0)
-
kW-mo/yr
|
- | $57,159 | |
02 | 4.212: Adopt in-house material generation | $34,931 | $146,400 |
$(-157.0)
(-2,038)
kWh
|
- | - | $35,088 | |
03 | 3.4154: Eliminate leaks in water lines and valves | $12,922 | $5,000 | - | - |
$12,922
-
Tgal
|
- | |
04 | 2.7229: Air condition only space necessary | $6,707 | $1,060 |
$6,707
87,113
kWh
|
- | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,366 | $3,000 |
$3,049
39,603
kWh
|
$1,317
-
kW-mo/yr
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $637 | $125 |
$445
5,774
kWh
|
$192
-
kW-mo/yr
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $212 | $60 |
$212
2,753
kWh
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $82 | $174 |
$23
297
kWh
|
$60
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $110,833 | $170,819 |
$6,232
80,942
kWh
|
$(-567.4)
-
kW-mo/yr
|
$12,922
-
Tgal
|
$92,247 | ||
TOTAL IMPLEMENTED | $20,478 | $6,245 |
$7,364
95,640
kWh
|
$192
-
kW-mo/yr
|
$12,922
-
Tgal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs