Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

141

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Totalizing fluid meters and counting devices
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0572 #07 Y:2024 Install timers on light switches in little used areas $258 $79
AS0572 #06 Y:2024 Install occupancy sensors $531 $130
AS0572 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,321 $1,387
AS0572 #04 Y:2024 Use computer programs to optimize hvac performance $1,801 $1,399
AS0572 #03 Y:2024 Install compressor air intakes in coolest locations $3,426 $278
AS0572 #02 Y:2024 Utilize controls to operate equipment only when needed $7,721 $37,385
AS0572 #01 Y:2024 Install back-up equipment $53,208 $12,653
UA0246 #04 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $855 $1,067
UA0246 #03 Y:2021 Utilize energy-efficient belts and other improved mechanisms $1,692 $373
UA0246 #02 Y:2021 Lower temperature during the winter season and vice-versa $12,152 $150
UA0246 #01 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $11,600 $9,695
MZ0288 #05 Y:2020 Recover waste heat from equipment $424 $430
MZ0288 #04 Y:2020 Use adjustable frequency drive or multiple speed motors on existing system $1,502 $3,320
MZ0288 #03 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $1,574 $1,660
MZ0288 #02 Y:2020 Reschedule plant operations or reduce load to avoid peaks $6,118 $3,400
MZ0288 #01 Y:2020 Utilize higher efficiency lamps and/or ballasts $15,689 $41,089
WV0591 #12 Y:2019 Insulate bare equipment $98 $360
WV0591 #11 Y:2019 Insulate bare equipment $151 $373
WV0591 #10 Y:2019 Analyze flue gas for proper air/fuel ratio $507 $2,500
WV0591 #09 Y:2019 Develop a repair/replace policy $944 $338