ITAC Assessment: UA0246
ITAC logo
ITAC Assessment: UA0246
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Water Meter
NAICS 334514: Totalizing Fluid Meter and Counting Device Manufacturing
SIC 3824: Totalizing Fluid Meters and Counting Devices
Sales Range $100
M
to 500
M
# of Employees 495
Plant Area 251,200
ft2
Annual Production 2,200,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,428,851 24,838,630
kWh
Electricity Demand $218,006 50,555
kW-mo/yr
Electricity Fees $7,730 -
Natural Gas $94,665 14,939
MMBtu
TOTAL YEARLY COSTS $1,749,252
RECOMMENDED SAVINGS* $26,299 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,455

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,600 $9,695 $10,056
174,790
kWh
$1,490
-
kW-mo/yr
$54
02 2.7221: Lower temperature during the winter season and vice-versa $12,152 $150 $12,095
210,242
kWh
- $57
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,692 $373 $1,418
24,656
kWh
$266
-
kW-mo/yr
$8
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $855 $1,067 $739
12,838
kWh
$112
-
kW-mo/yr
$4
TOTAL RECOMMENDED $26,299 $11,285 $24,308
422,526
kWh
$1,868
-
kW-mo/yr
$123
TOTAL IMPLEMENTED $12,455 $10,762 $10,795
187,628
kWh
$1,602
-
kW-mo/yr
$58
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs