ITAC Assessment: MZ0288
ITAC logo
ITAC Assessment: MZ0288
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Aircraft Components
NAICS 334514: Totalizing Fluid Meter and Counting Device Manufacturing
SIC 3824: Totalizing Fluid Meters and Counting Devices
Sales Range $50
M
to 100
M
# of Employees 111
Plant Area 76,000
ft2
Annual Production 20,000
units
Production Hrs. Annual 2,400
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,202 2,158,275
kWh
Electricity Demand $110,709 6,280
kW-mo/yr
Electricity Fees $2,031 -
Waste Disposal Costs
Water Usage $23,092 3,108
Tgal
TOTAL YEARLY COSTS $254,034
RECOMMENDED SAVINGS* $25,307 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,689 $41,089 $7,440
114,550
kWh
$8,249
-
kW-mo/yr
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,118 $3,400 - $6,118
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,574 $1,660 $602
15,510
kWh
$1,772
-
kW-mo/yr
$(-800.0)
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,502 $3,320 $383
9,858
kWh
$1,119
-
kW-mo/yr
-
05 2.2437: Recover waste heat from equipment $424 $430 $106
2,738
kWh
$318
-
kW-mo/yr
-
TOTAL RECOMMENDED $25,307 $49,899 $8,531
142,656
kWh
$17,576
-
kW-mo/yr
$(-800.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs