Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Automatic controls for regulating residential and commercial environments and appliances
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0306 #08 Y:2024 Insulate bare equipment $41,459 $20,803
IC0306 #07 Y:2024 Use demand controller or load shedder $1,874 $10,418
IC0306 #06 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $158 $432
IC0306 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $3,340 -
IC0306 #04 Y:2024 Eliminate or reduce compressed air usage $21,638 $33,160
IC0306 #03 Y:2024 Replace high resistance ducts, pipes, and fittings $2,629 $118
IC0306 #02 Y:2024 Utilize controls to operate equipment only when needed $22,099 $10,776
IC0306 #01 Y:2024 Use solar heat to make electricty $274,832 $1,429,458
NC0387 #09 Y:2008 Utilize higher efficiency lamps and/or ballasts $712 $351
NC0387 #08 Y:2008 Utilize higher efficiency lamps and/or ballasts $44,156 $85,555
NC0387 #07 Y:2008 Develop a repair/replace policy $2,019 $2,198
NC0387 #06 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $1,447 $100
NC0387 #05 Y:2008 Recover waste heat from equipment $8,105 $7,000
NC0387 #04 Y:2008 Use cooling tower or economizer to replace chiller cooling $21,000 $25,000
NC0387 #03 Y:2008 Use properly designed and sized hvac equipment $44,613 $45,000
NC0387 #02 Y:2008 Make ice during off peak hours for cooling $51,343 $72,000
NC0387 #01 Y:2008 Use demand controller or load shedder $202,240 $400,000
UD0713 #07 Y:2004 Develop a repair/replace policy $1,021 $3,807
UD0713 #06 Y:2004 Analyze flue gas for proper air/fuel ratio $5,925 $200
UD0713 #05 Y:2004 Use waste heat from hot flue gases to preheat $9,868 $22,600