Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Laboratory apparatus and furniture
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0466 #05 Y:2015 Install occupancy sensors $5,556 $6,409
SF0466 #04 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $3,752 $2,224
SF0466 #03 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $10,885 $5,614
SF0466 #02 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $12,015 $5,614
SF0466 #01 Y:2015 Reschedule plant operations or reduce load to avoid peaks $18,438 -
MI0272 #11 Y:2014 Use optimum thickness insulation $88 $360
MI0272 #10 Y:2014 Install vinyl strip / high speed / air curtain doors $727 $2,044
MI0272 #09 Y:2014 Utilize higher efficiency lamps and/or ballasts $811 $3,060
MI0272 #08 Y:2014 Use photocell controls $1,053 $360
MI0272 #07 Y:2014 Install occupancy sensors $1,059 $373
MI0272 #06 Y:2014 Reduce illumination to minimum necessary levels $3,714 $2,680
MI0272 #05 Y:2014 Convert combustion equipment to burn natural gas $4,265 $11,000
MI0272 #04 Y:2014 Lower temperature during the winter season and vice-versa $12,994 $80
MI0272 #03 Y:2014 Clean or color roof to reduce solar load $21,227 $27,707
MI0272 #02 Y:2014 Utilize a less expensive cooling method $59,120 $60,000
MI0272 #01 Y:2014 Use fossil fuel powered generator during peak demand periods $108,119 $1,400
MI0271 #11 Y:2014 Install occupancy sensors $956 $373
MI0271 #10 Y:2014 Utilize higher efficiency lamps and/or ballasts $1,369 $4,590
MI0271 #09 Y:2014 Reduce the pressure of compressed air to the minimum required $1,647 $80
MI0271 #08 Y:2014 Use photocell controls $2,361 $1,080