ITAC Assessment: MI0271
ITAC logo
ITAC Assessment: MI0271
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Clinical Laboratory Products
NAICS 333249: Other Industrial Machinery Manufacturing
SIC 3821: Laboratory Apparatus and Furniture
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 300,000
ft2
Annual Production 85,000,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $165,866 3,788,419
kWh
Electricity Demand $112,484 8,187
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,466 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,783

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Water Consumption Savings
01 2.3192: Use fossil fuel powered generator during peak demand periods $49,400 $1,400 - - $49,400 -
02 2.7425: Clean or color roof to reduce solar load $32,947 $40,065 $17,944
398,750
kWh
$15,003
-
kW-mo/yr
- -
03 3.4151: Minimize water usage $15,193 $16,600 - - - $15,193
-
Tgal
04 2.7111: Reduce illumination to minimum necessary levels $9,862 $3,960 $5,905
131,228
kWh
$3,957
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,939 $1,660 $2,054
45,639
kWh
$2,885
-
kW-mo/yr
- -
06 2.1332: Convert combustion equipment to burn natural gas $4,265 $11,000 - - $4,265 -
07 2.7447: Install vinyl strip / high speed / air curtain doors $3,527 $6,000 $1,466
32,583
kWh
$2,061
-
kW-mo/yr
- -
08 2.7134: Use photocell controls $2,361 $1,080 $1,413
31,394
kWh
$948
-
kW-mo/yr
- -
09 2.4231: Reduce the pressure of compressed air to the minimum required $1,647 $80 $685
15,213
kWh
$962
-
kW-mo/yr
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,369 $4,590 $1,369
30,414
kWh
- - -
11 2.7135: Install occupancy sensors $956 $373 $571
12,686
kWh
$385
-
kW-mo/yr
- -
TOTAL RECOMMENDED $126,466 $86,808 $31,407
697,907
kWh
$26,201
-
kW-mo/yr
$53,665 $15,193
-
Tgal
TOTAL IMPLEMENTED $21,783 $32,563 $1,940
43,100
kWh
$385
-
kW-mo/yr
$4,265 $15,193
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs