Assessment Year | 2015 |
---|---|
Principal Product | Consumable Plastic Lab Ware |
NAICS | 339113: Surgical Appliance and Supplies Manufacturing |
SIC | 3821: Laboratory Apparatus and Furniture |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
150,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $650,838 | 5,527,815 |
kWh
|
$0.12 |
Electricity Demand | $94,680 | 10,764 |
kW-mo/yr
|
$8.80 |
LPG | $7,585 | 255 |
MMBtu
|
$29.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $53,672 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,234 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $18,438 | - |
$15,895
135,005
kWh
|
$2,543
-
kW-mo/yr
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,015 | $5,614 |
$10,855
92,190
kWh
|
$1,160
-
kW-mo/yr
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,885 | $5,614 |
$9,841
83,581
kWh
|
$1,044
-
kW-mo/yr
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,752 | $2,224 |
$3,752
31,868
kWh
|
- | - | - | |
05 | 2.7135: Install occupancy sensors | $5,556 | $6,409 |
$4,396
37,336
kWh
|
$1,160
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,026 | $4,733 |
$2,994
25,430
kWh
|
- | $87 | $(-55.0) | |
TOTAL RECOMMENDED | $53,672 | $24,594 |
$47,733
405,410
kWh
|
$5,907
-
kW-mo/yr
|
$87 | $(-55.0) | ||
TOTAL IMPLEMENTED | $35,234 | $24,594 |
$31,838
270,405
kWh
|
$3,364
-
kW-mo/yr
|
$87 | $(-55.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs