ITAC Assessment: SF0466
ITAC logo
ITAC Assessment: SF0466
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Consumable Plastic Lab Ware
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 3821: Laboratory Apparatus and Furniture
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 150,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $650,838 5,527,815
kWh
Electricity Demand $94,680 10,764
kW-mo/yr
LPG $7,585 255
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,672 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,234

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $18,438 - $15,895
135,005
kWh
$2,543
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,015 $5,614 $10,855
92,190
kWh
$1,160
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,885 $5,614 $9,841
83,581
kWh
$1,044
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,752 $2,224 $3,752
31,868
kWh
- - -
05 2.7135: Install occupancy sensors $5,556 $6,409 $4,396
37,336
kWh
$1,160
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,026 $4,733 $2,994
25,430
kWh
- $87 $(-55.0)
TOTAL RECOMMENDED $53,672 $24,594 $47,733
405,410
kWh
$5,907
-
kW-mo/yr
$87 $(-55.0)
TOTAL IMPLEMENTED $35,234 $24,594 $31,838
270,405
kWh
$3,364
-
kW-mo/yr
$87 $(-55.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs