ITAC Assessment: TN0353
ITAC logo
ITAC Assessment: TN0353
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product RAILROAD CAR HITCHES
NAICS
n/a
SIC 3743: Railroad Equipment
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 26,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,743 1,953,107
kWh
Natural Gas $25,886 4,825
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,661 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,928

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7123: Keep lamps and reflectors clean $10,650 $47,250 $9,491
148,300
kWh
- $1,159
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $5,083 $19,050 $5,083
79,426
kWh
- -
03 2.2511: Insulate bare equipment $1,253 $2,380 - $1,253
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,936 $780 $3,936
61,547
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,251 - $2,251
35,170
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $488 $689 $488
7,620
kWh
- -
TOTAL RECOMMENDED $23,661 $70,149 $21,249
332,063
kWh
$1,253
-
MMBtu
$1,159
TOTAL IMPLEMENTED $7,928 $3,849 $6,675
104,337
kWh
$1,253
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs