| Assessment Year | 2005 |
|---|---|
| Principal Product | Steel forgings |
| NAICS | 332111: Iron and Steel Forging |
| SIC | 3462: Iron and Steel Forgings |
| Sales Range | $10 M to 50M |
| # of Employees | 40 |
| Plant Area |
80,000
ft2
|
| Annual Production | 17,000,000
lb
|
| Production Hrs. Annual | 4,998
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $151,735 | 2,445,821 |
kWh
|
$0.062 |
| Electricity Demand | $34,827 | 10,881 |
kW-mo/yr
|
$3.20 |
| Electricity Fees | $2,855 | - |
|
- |
| Natural Gas | $1,115,248 | 161,177 |
MMBtu
|
$6.92 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $41,900 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $21,990 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 3.6192: Use a less expensive method of waste removal | $19,500 | $700 | - | - |
$19,500
-
lb
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $14,500 | $1,740 |
$10,800
176,000
kWh
|
$3,700
-
kW-mo/yr
|
- | |
| 03 | 2.4239: Eliminate or reduce compressed air usage | $5,560 | $360 |
$4,700
77,400
kWh
|
$860
-
kW-mo/yr
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,000 | $20 |
$850
13,800
kWh
|
$150
-
kW-mo/yr
|
- | |
| 05 | 2.4314: Use synthetic lubricant | $600 | - |
$460
7,500
kWh
|
$140
-
kW-mo/yr
|
- | |
| 06 | 2.7124: Make a practice of turning off lights when not needed | $410 | $470 |
$300
5,000
kWh
|
$110
-
kW-mo/yr
|
- | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $330 | $400 |
$280
4,600
kWh
|
$50
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $41,900 | $3,690 |
$17,390
284,300
kWh
|
$5,010
-
kW-mo/yr
|
$19,500
-
lb
|
||
| TOTAL IMPLEMENTED | $21,990 | $2,520 |
$17,090
279,300
kWh
|
$4,900
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs