ITAC Assessment: IC0207
ITAC logo
ITAC Assessment: IC0207
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Food Ingredients
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 18
Plant Area 58,864
ft2
Annual Production 528
Tgal
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $439,823 8,173,937
kWh
Electricity Demand $44,025 9,576
kW-mo/yr
Natural Gas $172,114 33,023
MMBtu
Waste Disposal Costs
Water Usage $23,678 1,138
Tgal
Water Disposal $48,698 17,420
Tgal
TOTAL YEARLY COSTS $728,338
RECOMMENDED SAVINGS* $29,853 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,822 $7,531 $4,088
74,332
kWh
$734
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,473 $13,820 $15,473
281,318
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,822 $290 $3,822
69,490
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,736 $7,996 $5,736
95,040
kWh
-
TOTAL RECOMMENDED $29,853 $29,637 $29,119
520,180
kWh
$734
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs