Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Laboratory apparatus and furniture
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0466 #06 Y:2015 Utilize higher efficiency lamps and/or ballasts $3,026 $4,733
SF0466 #05 Y:2015 Install occupancy sensors $5,556 $6,409
SF0466 #04 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $3,752 $2,224
SF0466 #03 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $10,885 $5,614
SF0466 #02 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $12,015 $5,614
SF0466 #01 Y:2015 Reschedule plant operations or reduce load to avoid peaks $18,438 -
SF0331 #07 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $885 $2,838
SF0331 #06 Y:2006 Install occupancy sensors $371 $888
SF0331 #05 Y:2006 Utilize higher efficiency lamps and/or ballasts $3,535 $4,389
SF0331 #04 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $4,020 $2,819
SF0331 #03 Y:2006 Optimize plant power factor $3,422 $1,950
SF0331 #02 Y:2006 Install outside air damper / economizer on hvac unit $16,440 $3,828
SF0331 #01 Y:2006 Utilize controls to operate equipment only when needed $4,466 $169
SD0136 #08 Y:1996 Reduce scrap production $56,160 -
SD0136 #07 Y:1996 Install occupancy sensors $1,471 $1,001
SD0136 #06 Y:1996 Install spectral reflectors / delamp $6,002 $4,080
SD0136 #05 Y:1996 Utilize higher efficiency lamps and/or ballasts $3,979 $5,928
SD0136 #04 Y:1996 Use optimum thickness insulation $1,905 $651
SD0136 #03 Y:1996 Reduce the pressure of compressed air to the minimum required $1,321 $40
SD0136 #02 Y:1996 Preheat combustion air with waste heat $2,074 $2,083