ITAC Assessment: SF0331
ITAC logo
ITAC Assessment: SF0331
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Disposable Laboratory Equipment
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3821: Laboratory Apparatus and Furniture
Sales Range less than $500
k
# of Employees 80
Plant Area 53,000
ft2
Annual Production 450,000
units
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $318,199 2,991,120
kWh
Electricity Demand $60,108 6,299
kW-mo/yr
Electricity Fees $57,178 -
LPG $2,173 1,394
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,139 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,812

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6231: Utilize controls to operate equipment only when needed $4,466 $169 $3,893
15,604
kWh
$573
-
kW-mo/yr
02 2.7241: Install outside air damper / economizer on hvac unit $16,440 $3,828 $16,440
154,556
kWh
-
03 2.3212: Optimize plant power factor $3,422 $1,950 $3,422
-
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,020 $2,819 $3,200
22,370
kWh
$820
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,535 $4,389 $3,082
24,710
kWh
$453
-
kW-mo/yr
06 2.7135: Install occupancy sensors $371 $888 $254
2,391
kWh
$117
-
kW-mo/yr
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $885 $2,838 $752
5,819
kWh
$133
-
kW-mo/yr
TOTAL RECOMMENDED $33,139 $16,881 $31,043
225,450
kWh
$2,096
-
kW-mo/yr
TOTAL IMPLEMENTED $24,812 $9,274 $23,669
197,261
kWh
$1,143
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs