160
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Laboratory apparatus and furniture | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| AM0963 #03 Y:2025 | 03 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $615 | $1,000 |
n/a
|
| AM0963 #02 Y:2025 | 02 | 2025 | Optimize plant power factor | $6,370 | $9,600 |
n/a
|
| AM0963 #01 Y:2025 | 01 | 2025 | Apply for tax-free status for energy purchases | $40,000 | $15,000 |
n/a
|
| MI0423 #10 Y:2023 | 10 | 2023 | Analyze flue gas for proper air/fuel ratio | $277 | $1,360 | |
| MI0423 #09 Y:2023 | 09 | 2023 | Air condition only space necessary | $1,771 | $900 | |
| MI0423 #08 Y:2023 | 08 | 2023 | Install outside air damper / economizer on hvac unit | $2,131 | $1,500 | |
| MI0423 #07 Y:2023 | 07 | 2023 | Install occupancy sensors | $4,508 | $1,250 | |
| MI0423 #06 Y:2023 | 06 | 2023 | Install partitions to reduce size of conditioned space | $6,580 | $1,455 | |
| MI0423 #05 Y:2023 | 05 | 2023 | Modify refrigeration system to operate at a lower pressure | $9,196 | $27,500 | |
| MI0423 #04 Y:2023 | 04 | 2023 | Clean or color roof to reduce solar load | $10,785 | $37,678 | |
| MI0423 #03 Y:2023 | 03 | 2023 | Lower temperature during the winter season and vice-versa | $22,808 | $580 | |
| MI0423 #02 Y:2023 | 02 | 2023 | Utilize higher efficiency lamps and/or ballasts | $26,513 | $51,984 | |
| MI0423 #01 Y:2023 | 01 | 2023 | Turn off equipment when not in use | $41,834 | - | |
| OR0650 #06 Y:2015 | 06 | 2015 | Use solar heat to make electricty | $16,731 | $135,510 | |
| OR0650 #05 Y:2015 | 05 | 2015 | Heat water during off-peak periods and store for later use | $1,291 | $4,404 | |
| OR0650 #04 Y:2015 | 04 | 2015 | Install occupancy sensors | $1,001 | $2,678 | |
| OR0650 #03 Y:2015 | 03 | 2015 | Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $719 | $1,200 | |
| OR0650 #02 Y:2015 | 02 | 2015 | Improve combustion control capability | $23,922 | $24,660 | |
| OR0650 #01 Y:2015 | 01 | 2015 | Eliminate/reduce an operation | $20,348 | $2,295 | |
| SF0466 #06 Y:2015 | 06 | 2015 | Utilize higher efficiency lamps and/or ballasts | $3,026 | $4,733 |