ITAC Assessment: OR0650
ITAC logo
ITAC Assessment: OR0650
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Laboratory Equipment
NAICS 334516: Analytical Laboratory Instrument Manufacturing
SIC 3821: Laboratory Apparatus and Furniture
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 50,000
ft2
Annual Production 5,777
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,598 831,735
kWh
Electricity Demand $9,747 3,238
kW-mo/yr
Electricity Fees $14,888 -
Natural Gas $45,747 5,140
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,012 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,010

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 3.1161: Eliminate/reduce an operation $20,348 $2,295 - - - - - $20,348 -
02 2.1116: Improve combustion control capability $23,922 $24,660 - - $23,922
-
MMBtu
- - - -
03 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $719 $1,200 - - - $719
-
gal
- - -
04 2.7135: Install occupancy sensors $1,001 $2,678 $822
13,593
kWh
- - - $47 - $132
05 2.3111: Heat water during off-peak periods and store for later use $1,291 $4,404 $1,291
21,480
kWh
- - - - - -
06 2.9114: Use solar heat to make electricty $16,731 $135,510 $16,649
276,948
kWh
$82
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $64,012 $170,747 $18,762
312,021
kWh
$82
-
kW-mo/yr
$23,922
-
MMBtu
$719
-
gal
$47 $20,348 $132
TOTAL IMPLEMENTED $2,010 $5,604 $1,291
21,480
kWh
- - $719
-
gal
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs