Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,790

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Laboratory apparatus and analytical, optical, measuring, and controlling instruments
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
HO0097 #01 Y:1994 Utilize higher efficiency lamps and/or ballasts $3,625 $10,224
ND0206 #11 Y:1994 Utilize higher efficiency lamps and/or ballasts $78 $200
ND0206 #10 Y:1994 Replace electrically-operated equipment with fossil fuel equipment $181 $600
ND0206 #09 Y:1994 Install vinyl strip / high speed / air curtain doors $252 $380
ND0206 #08 Y:1994 Utilize higher efficiency lamps and/or ballasts $553 $117
ND0206 #07 Y:1994 Install compressor air intakes in coolest locations $733 $900
ND0206 #06 Y:1994 Re-size charging openings or add movable cover or door $1,035 $500
ND0206 #05 Y:1994 Optimize plant power factor $2,352 $7,000
ND0206 #04 Y:1994 Utilize higher efficiency lamps and/or ballasts $2,685 $1,147
ND0206 #03 Y:1994 Change rate schedules or other changes in utility service $3,504 -
ND0206 #02 Y:1994 Use most efficient type of electric motors $7,724 $11,100
ND0206 #01 Y:1994 Eliminate leaks in inert gas and compressed air lines/ valves $8,667 $500
MA0317 #07 Y:1994 Increase amount of waste recovered for resale $4,700 -
MA0317 #06 Y:1994 Reuse / recycle/ sell paper products $28,200 $700
MA0317 #05 Y:1994 Install occupancy sensors $1,701 $1,440
MA0317 #04 Y:1994 Install compressor air intakes in coolest locations $1,897 $1,188
MA0317 #03 Y:1994 Use most efficient type of electric motors $2,082 $2,792
MA0317 #02 Y:1994 Eliminate leaks in inert gas and compressed air lines/ valves $10,949 -
MA0317 #01 Y:1994 Optimize plant power factor $14,534 $20,294
KU0448 #08 Y:1994 Utilize higher efficiency lamps and/or ballasts $413 $720