Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Electronic Weighing scales and Printers
NAICS
n/a
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 160,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 2,470
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,416 1,990,328
kWh
Electricity Demand $77,079 6,317
kW-mo/yr
Natural Gas $17,649 2,659
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,519 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,282

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $22,008 $70,980 $11,773
171,747
kWh
$10,235
-
kW-mo/yr
- - - -
02 2.7135: Install occupancy sensors $4,085 $11,200 $2,668
38,687
kWh
$1,417
-
kW-mo/yr
- - - -
03 2.7135: Install occupancy sensors $8,168 $1,680 $5,335
77,667
kWh
$2,833
-
kW-mo/yr
- - - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,815 $13,397 $10,739
116,647
kWh
- $(-4,924.0)
-
MMBtu
- - -
05 2.6212: Turn off equipment during breaks, reduce operating time $67 $100 $67
879
kWh
- - - - -
06 2.4226: Use / purchase optimum sized compressor $3,740 $9,900 $2,373
34,584
kWh
$1,367
-
kW-mo/yr
- - - -
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,096 $3,194 $1,069
15,533
kWh
$1,100
-
kW-mo/yr
$(-73.0)
-
MMBtu
- - -
08 2.4239: Eliminate or reduce compressed air usage $662 $2,200 $394
5,569
kWh
$268
-
kW-mo/yr
- - - -
09 3.5315: Lease / purchase baler; sell cardboard to recycler $2,218 $6,800 - - - - $2,218
-
lb
-
10 3.8211: Convert to aqueous cleaning system $1,660 $5,561 - - - $840
-
gal
- $820
TOTAL RECOMMENDED $50,519 $125,012 $34,418
461,313
kWh
$17,220
-
kW-mo/yr
$(-4,997.0)
-
MMBtu
$840
-
gal
$2,218
-
lb
$820
TOTAL IMPLEMENTED $11,282 $28,958 $13,179
152,110
kWh
$1,367
-
kW-mo/yr
$(-4,924.0)
-
MMBtu
$840
-
gal
- $820
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs