| Assessment Year | 1995 |
|---|---|
| Principal Product | Pressure Gauges, Thermometers, Recorders |
| NAICS |
n/a
|
| SIC | 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products |
| Sales Range | $10 M to 50M |
| # of Employees | 185 |
| Plant Area |
130,000
ft2
|
| Annual Production | 275,000
pieces
|
| Production Hrs. Annual | 2,795
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $87,176 | 1,486,811 |
kWh
|
$0.059 |
| Natural Gas | $21,419 | 2,444 |
MMBtu
|
$8.76 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $22,857 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,189 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (haz) Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,625 | $10,224 |
$3,625
61,254
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,414 | $4,372 |
$1,414
23,740
kWh
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $112 | $505 |
$112
1,758
kWh
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $265 | $600 |
$265
4,396
kWh
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,495 | $280 |
$1,495
25,498
kWh
|
- | |
| 06 | 2.2511: Insulate bare equipment | $278 | $290 |
$278
4,689
kWh
|
- | |
| 07 | 3.1191: Change procedures / equipment / operating conditions | $15,668 | $2,000 | - |
$15,668
-
gal
|
|
| TOTAL RECOMMENDED | $22,857 | $18,271 |
$7,189
121,335
kWh
|
$15,668
-
gal
|
||
| TOTAL IMPLEMENTED | $7,189 | $16,271 |
$7,189
121,335
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Liquid (haz) Savings | |||