ITAC Assessment: OD0041
ITAC logo
ITAC Assessment: OD0041
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Measuring and Controlling Devices, NEC
NAICS
n/a
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 42,400
ft2
Annual Production 35,611
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,568 1,436,694
kWh
Natural Gas $3,745 622
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,157 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $1,291 - - $1,291
-
MMBtu
02 2.1134: Eliminate leaks in combustible gas lines $426 - - $426
-
MMBtu
03 2.4133: Use most efficient type of electric motors $1,660 $3,096 $1,660
24,033
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $299 $619 $299
4,103
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,971 $11,838 $3,971
59,789
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $241 $270 $241
4,103
kWh
-
07 2.7122: Disconnect ballasts $269 - $269
3,810
kWh
-
TOTAL RECOMMENDED $8,157 $15,823 $6,440
95,838
kWh
$1,717
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs